Laserfiche WebLink
0 <br />a` Item No. 1 — Contractor to Provide FRP Slide Gates <br />Delete paragraph 1.1.A of Section 15110 — FRP Slide Gates, and replace it with <br />amended paragraph 1.1.A., below. The Contractor shall furnish the FRP slide gates. <br />HydroMentia will not furnish them. <br />A. SCOPE OF WORK <br />CONTRACTOR shall furnish and install six slide gates of FRP construction to be <br />located and sized as noted on the Drawings, as manufactured by Plasti-Fab of <br />Tualatin, Oregon. Gates shall be provided by manufacturer complete with <br />operators, parts and appurtenances. Gates aFe ,: 1:311i.11 <br />+ + END OF ADDENDUM NO. 4 + + <br />n <br />I I F:\Public Works\KeithM\Stormwater Projects\Egret Marsh - REV SEDOd Documentts ddendumsWddendum #41Adde dum MARSH <br />LLL��I #4.docx <br />