My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-383
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:38:35 PM
Creation date
10/5/2015 9:04:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2008
Control Number
2008-383
Agenda Item Number
12.I.2
Entity Name
H & D Construction
Subject
Eagret Marsh Stormwater Park
Area
Egret Marsh Stormwater Park
Project Number
0430
Bid Number
2008076
Supplemental fields
SmeadsoftID
8759
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Two (2) Prefabricated Concrete Buildings <br />■ One (1) Prefabricated Bathroom structure <br />All other items are not so segregated, because their purchase is integral to the satisfactory <br />completion of this Contract. Payment for direct purchase items will be as follows: <br />20% Upon Order, subsequent to shop drawing review and approval <br />• 30% Upon manufacturer completion and satisfactory factory testing <br />• 50% Upon delivery . <br />4.03 Should the OWNER elect to directly purchase any of the "furnished" items as listed in <br />the Bid Form as items 2.02 through 2.06, then the cost of such items whose provision has <br />been assumed by the OWNER shall be reflected within the contracted lump sum. <br />[The Remainder of this Page Intentionally Left Blank] <br />Latest Rev. 08/08 00310-3 <br />FAPublic Works\Cliff Suthard\1 A A Egret Marsh Redesign Contract Documents Technical Specifications\Div 0\00310 - Bid Form <br />Egret Marsh.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.