17: What percentage of the total project will be performed by the firm's personnel? <br />-7D <br />18. Attach a separate page to this questionnaire that lists the firm's construction equipment <br />that will be used on this project. Also, list the construction equipment that the firm will rent <br />for this project. <br />19. As required by Section 15060 Horizontal Directional Drilling Article 1.06 submit the <br />following. All responses shall be based on the project specific information. Generic <br />assumptions will be acceptable only when site specific data is not available. <br />a. Three (3) examples of similar successful project experience. Minimum requirements <br />are 20" outside diameter, HDPE pipe, and 1500 LF single pull river crossings. Provide <br />project contact name, title, telephone number, mailing address, email address, etc. for <br />whom the successful projects were performed. <br />b. Calculations for pull back force required. and the resulting rig size proposed for this <br />project. <br />c. Calculations demonstrating that the pipe will not be overstressed. <br />d. Verify that the information presented herein will be fully incorporated into the work plan. <br />e. Identify which, if any, items of the basis of design that the CONTRACTOR proposes to <br />change (entry/exit angles, depth, radii, etc.). These changes shall be reflected in the <br />calculations and information required in these evaluation criteria. <br />[The remainder of this page was left blank intentionally) <br />Last Revised 08/2008 00456-3 Egret Marsh <br />FAPublic Works\Cliff Suthard\1 A A Egret Marsh Redesign Contract Documents Technical Specifications\Div 0\00456 - Qualifications <br />Questionnaire Egret Marsh.doc <br />