a SECTION 00520 -AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, having an address <br />of 1801 27th Ave, Vero Beach, FL 32960 (hereinafter called OWNER) and H & D <br />CONSTRUCTION CO., INC. having an address of 1805 S 25TH Street, Suite 1, Fort Pierce FL <br />34947 (hereinafter called CONTRACTOR). <br />n OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Construction of Stormwater Management Facilities Including an Algal Turf Scrubber <br />Stormwater Treatment Unit with Support Facilities, Site Works, Earthwork, Grading, <br />Drainage, Paving, Pumping Station at Canal 'D' and Pumping Station at the Site, <br />Directional Bore of a 24" Force Main, Site Landscaping and Temporary Irrigation, 30 <br />day Start Up and Operation Period and all Related Incidentals. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Egret Marsh Stormwater Park <br />County Project Number: 0430 <br />Project Address:' 72954 th Street, Vero Beach, FI <br />f-1 ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department or its representative is hereinafter called <br />the ENGINEER and will act as OWNER's representative, assume all duties and <br />responsibilities, and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with the completion of the Work in accordance with the Contract <br />Documents. <br />ARTICLE 4 -_CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion and Final Payment <br />A. The Work will be substantially completed on or before the 270th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions (and Supplementary Conditions if applicable), and completed and ready for <br />payment of Final Completion of Construction (except for Bid Item No. 2.01.12) in accordance <br />with paragraph 14.07 of the General Conditions (and Supplementary Conditions if <br />Last 0 Revision 12/2008 00520-1 Egret Marsh <br />