My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-383
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:38:35 PM
Creation date
10/5/2015 9:04:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2008
Control Number
2008-383
Agenda Item Number
12.I.2
Entity Name
H & D Construction
Subject
Eagret Marsh Stormwater Park
Area
Egret Marsh Stormwater Park
Project Number
0430
Bid Number
2008076
Supplemental fields
SmeadsoftID
8759
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aDRAWINGS CONTINUED <br />a <br />Sheet <br />Algal Turf Scrubber <br />Desc <br />System Drawings <br />C -1A <br />General ATS Information <br />C -2A <br />ATS Plan and Sections <br />C -3A <br />C -4A <br />ATS Headworks Plan, Details, and Sections <br />C5 -A <br />ATS Headworks Details and Sections <br />ATS distribution <br />Manifold <br />C -6A <br />ATS Distribution Laterals <br />C -7A <br />-8A <br />ATS Effluent Works Plan and Effluent Flume Profile <br />ATS <br />DC <br />Effluent Flume Sections <br />C -9A <br />Harvest and Effluent Distribution Box <br />C-1 OA <br />Effluent Details <br />C-1 1A <br />ATS Liner Plan and Details <br />C -12A <br />Miscellaneous Details <br />Algal Turf Scrubber System Structural Drawings <br />S1A <br />S2A <br />Drawing Index, Abbreviations, and General Notes <br />ATS Influent Structures <br />S3A <br />— Foundation Plan <br />ATS Influent Structures — Upper <br />QS4A <br />S5A <br />ATS Influent Structures — Structural Sections <br />S6A <br />ATS Influent Structures — Structural Sections <br />S7A <br />Harvest and Flow Distribution — Foundation Plan <br />S8A <br />Harvest and Flow Distribution — Upper <br />S9A <br />Harvest and Flow Distribution — Structural Sections <br />S10A <br />Harvest and Flow Distribution - Structural Sections <br />S11A <br />Harvest and Flow Distribution - Structural Sections <br />Structural Details <br />Electrical Drawings <br />OE-01 <br />E-02 <br />Electrical Notes Symbols and Abbreviations <br />Electrical Site Plan -1 <br />E-03 <br />E-04 <br />Electrical Site Plan -2 <br />Electrical Site Plan -4 <br />E-05 <br />Single Line diagram <br />E-06 <br />E-07 <br />Polishing Pond Starter Control Panel Details <br />E-08 <br />Lateral D Canal Pump Station Single Line diagram <br />E-09 <br />ATS Headworks Electrical Plan View <br />E-10 <br />Lateral D Canal Pump Station Electrical Plan view <br />ATS <br />E-11 <br />Effluent Structure Electrical Plan view <br />D <br />E-12 <br />Final Polishing Pond Pump Station Electrical Plan view <br />Lighting fixture Details <br />E-13 <br />Panel Schedules <br />E-14 <br />Electrical Details <br />E-15 <br />Electrical Details <br />Last Revised 8/2008 00010-6 <br />FAPublic WorlsIKeithM\Stormwater Projects\Egret Marsh Construction\Conformed Contract Docurnents\00010Egret <br />T blerof of <br />D Egret Marsh.doc <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.