My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:05:16 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
05/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ej <br />REPORT RE -INSTALLATION AND TESTING OF PRODUCTION AND MONITORING <br />WELLS, SOUTH COUNTY WATER TAXING DISTRICT <br />TOM TESSIER OF GERAGHTY & MILLER REPORTED THAT NO <br />ADDITIONAL INFORMATION IS NEEDED FOR THE CONSUMPTIVE USE APPLICA- <br />TION TO ST. JOHN'S RIVER WATER MANAGEMENT DISTRICT,AND IT SHOULD <br />GO BEFORE THE GOVERNING BOARD ON JUNE 9TH. AS IT STANDS NOW, HE <br />DID NOT FORESEE ANY PROBLEMS. <br />COMMISSIONER SCURLOCK INQUIRED IF WE ARE PAYING CLOSE <br />ATTENTION TO THE DROUGHT SITUATION. <br />MR. TESSIER STATED THAT LOWER PUMPING LEVELS FROM THE <br />DROUGHT WERE ANTICIPATED IN THE ANALYSIS, AND THEY ARE NOT MONITOR- <br />ING AT PRESENT. <br />IN FURTHER DISCUSSION, THE BOARD GENERALLY AGREED THAT IT <br />WOULD BE WORTHWHILE TO KEEP ON MONITORING DURING THE DROUGHT <br />SITUATION. <br />MR. TESSIER AND ENGINEER JOHN ROBBINS ALSO FELT THE SMALL <br />ADDITIONAL EXPENSE INVOLVED WOULD BE WARRANTED AND ESTIMATED IT <br />WOULD NOT COST MORE THAN $500. <br />ON MOTION BY COMMISSIONER BIRD, SECONDED BY COMMISSIONER <br />WODTKE, THE BOARD UNANIMOUSLY AUTHORIZED -MR. TESSIER AND ENGINEER <br />ROBBINS TO CONTINUE MONITORING THE SOUTH COUNTY WATER TAXING DISTRICT <br />WELLS FOR THE. -NEXT THIRTY DAYS FOR AN AMOUNT NOT TO EXCEED $500.00. <br />INTERIM FINANCING SOUTH COUNTY WATER SYSTEM - ARCH N. ROBERTS &-CO. <br />STAN LEVINGOOD OF ARCH W. ROBERTS & CO. REPORTED THAT HE <br />NOW HAS THE HARD NUMBER HE PROMISED, AND IT IS $232,819 COST LESS <br />THE FMHA So INTERIM -DRAWS; THAT, IN ESSENCE, WILL BE -THE AMOUNT <br />OF CASH AVAILABLE -TO THE COUNTY ON OCTOBER -1, 19811 ASSUMING THAT THE <br />ENGINEER'S CONSTRUCTION DRAWS ARE ACCURATE, TO EITHER PAY ADDITIONAL <br />COSTS OF THE PROJECT OR TO REDUCE THE AMO-UNT OF THE LONG TERM FMHA <br />LOAN. - <br />ATTORNEY--COLLINS NOTED THAT THERE ARE TWO NUMBERS WE NEED -- <br />TO PLUG INTO THE RESOLUTION - ONE IS THE INTEREST RATE, -WHICH HE <br />BELIEVED IS 9.2% - AND THE OTHER IS THE -BLANK -WHERE IT STATES - <br />"NOTES ARE HEREBY SOLD AND AWARDED TO -ARCH ROBERTS CO. AND SEEDY <br />CORP. AT THE PRICE OF " <br />MAY 61981 <br />63 BOOK 46 FACE 3 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.