My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:05:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
05/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />,°mb�i_r :.ac .'z.^..«'-'?. '°.'�,S•:" 'S1'r:.ti3''.. �.t cii'.��-,,.:..Y�..`R.%sw-,°' _..�: <br />.r <br />IV. COST SUMMARY <br />The following will present an estimated cost summary of the two <br />alternatives for interim sewage treatment along with an estimated cost <br />for repairs to the two existing pumping stations. In addition, esti- <br />mates will be shown for technical services associated with the design <br />and implementation of each alternative and a total Estimated Project <br />Cost will be shown. <br />It should be noted, both the eastern and southern pumping stations <br />require considerable work before they can be depended on for complete <br />and uninterrupted service. Work to the pumping -stations would include <br />reworking the electrical components and level controls, adding a motor <br />to the pump in the southern station and adding a pump and motor to the <br />eastern station. It should also be noted, the original design. of the <br />two pumping stations allows the stations to be flooded during high water <br />conditions. Therefore, improvements to the existing pumping stations <br />should be considered as an interim measure and a possible redesign of <br />both pumping stations should be considered as part -of an ultimate solu- <br />tion for this utility system. <br />--MAY AcE 43$. <br />ESTIMATED PROJECT <br />COST SUMMARY <br />Item <br />Cost <br />Alternative <br />1. Alternative 2 <br />1. <br />Sewage Treatment. Improvements_- <br />$ 33,000 <br />_$ 53,000 <br />2. <br />Refurbishment of Eastern Pump <br />- <br />Station <br />101-000 <br />10,000 <br />3. <br />Refurbishment of Southern <br />Pump Station <br />8,000 <br />81000 <br />Construction Cost Sub -total <br />$ 51,000 <br />$ 71,000 <br />4. <br />Technical Services .(Engineer.. <br />- <br />ing, Permitting, Legal, Admin- <br />istrative) @ 18% <br />$ 9,180 <br />$ 12,780 <br />5. <br />Conti.ngencies @ 10% <br />$ 5,100 <br />$ .7,100 <br />Total Estimated Project Cost <br />$ 65,280 <br />- _g0,880 <br />NOTE: <br />Total Estimated Project Cost <br />does not include <br />interest daring <br />construction. <br />_ <br />--MAY AcE 43$. <br />
The URL can be used to link to this page
Your browser does not support the video tag.