Laserfiche WebLink
Table 2 <br />BUDGET ESTIMATE <br />DESIGN, PERMITTING & CONSTRUCTION SERVICES <br />INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION <br />PHASE 2. TASK 1: Engineerine Design <br />ITEM <br />BASIS <br />RATE QUANTITY <br />ESTIMATED <br />BUDGET <br />A: PrQfes iona];Services <br />;.: ,�* F �, "NON ON 1. <br />a. Principal <br />hr <br />$189 <br />0 <br />$0 <br />b. Associate <br />hr <br />$179 <br />8 <br />$1,432 <br />c. Senior Project Engineer <br />hr <br />$158 <br />0 <br />$0 <br />d. Project Engineer <br />hr <br />$125 <br />16 <br />$1,996 <br />e. Engineer <br />hr <br />$109 <br />0 <br />$0 <br />f. Senior Staff Engineer <br />hr <br />$97 <br />12 <br />$1,161 <br />g. Staff Engineer <br />hr <br />$81 <br />0 <br />$0 <br />Subtotal Professional Services <br />$4,588 <br />e � - d' ni �tive Serviees'� <br />� <br />a. CADD Designer <br />hr <br />$115 <br />10 <br />$1,153 <br />b. Senior CADD Operator <br />hr <br />$113 <br />0 <br />$0 <br />c. Drafter/CARD Operator <br />hr <br />$70 <br />14 <br />$984 <br />d. Technical/Administrative Assistant <br />hr <br />$79 <br />0 <br />$0 <br />e. Technical Word Processor <br />hr <br />$80 <br />4 <br />$321 <br />f. Clerical <br />hr <br />$48 <br />6 <br />$290 <br />Subtotal Technical/Administrative Services <br />$2,748 <br />OK�Re ab s 5 <br />a. Lodging <br />day <br />$100 <br />0 <br />$0 <br />b. Per Diem <br />day <br />$21 <br />0 <br />$0 <br />c. Communications Fee <br />3% labor <br />0.03 <br />$7,337 <br />$220 <br />d. CADD Computer System <br />hr <br />S15 <br />24 <br />$360 <br />e. Vehicle Rental <br />day <br />$150.00 <br />0 <br />$0 <br />f. 8.5"x11" Photocopies <br />each <br />$0.12 <br />500 <br />$60 <br />g. CADD Drawings <br />each <br />$3 <br />50 <br />$150 <br />Subtotal Reimbursables <br />$790 <br />. r$. 1�;7`� <br />"MOM* � <br />XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants <br />