My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. IMPACT FEES <br />The following will outline a possible impact fee which could be <br />assessed to all non -vested water connections on the South Beach if the <br />County serviced the area. The impact fee shown is based on utilizing <br />existing County ordinances. The ordinances utilized are 80-21, Water <br />Main Extensions and 80-22, Reserve Plant Capacity. <br />As the subaqueous crossing of the Indian River is an unusual <br />expense requirement to provide water service, the cost of the subaqueous <br />crossing could be paid for -by the non -vested users of the South Beach <br />System. In addition, it will be necessary to construct a ground storage - <br />tank and booster pumping station to provide full- service for any connec- <br />tion over and above the 1,000 one inch equivalent connections which are <br />now vested in the Sau-th Beach system. This cost will also be considered <br />as required to provide service under the Main Extension Ordinance. Below <br />is a calculation of a possible impact fee-based on the above and consider- <br />ation of a reserve plant capacity fee. <br />A. Main Extension Fees <br />Subaqueous River Crossing Cost $1,6209000 <br />Ground Storage Tank and Pumping <br />Station.Cost = $ -450,000 <br />Total Cost for Main Extensions - $2,070,000 <br />Number of Pion -Vested Connections = .1,248 <br />Associated Impact Fee for -Main _ - <br />Extensions = $. -1,658 <br />B. Reserve Plant Capacity - <br />The -existing fee for providing reserve water treatment plant <br />capacity for future connections to the County's water --system is $250 <br />_0 <br />478 <br />98 _ <br />-t.;.-� <br />L"x�dE: 7L?�''�. <br />.,�.a... �,w-. +�.. �a�-ua...:n _ - .am.sn�.r':-�..: <br />, ..y <br />�g ...- ,'�+r.-•�-. ...'� .. ..;,.�.-:-__ .. <br />,R-.JrJ �+s4 .,y`y "�"_nypf��lwwj7 S f fil�L •' �fyv J `y... ". �X...-i'fa+.tae"4 ..i-�_.v.e.v....... _. <br />�°-�.�'' 4..—.iw'+a✓0.+.�Y-i.r. - � <br />... v ., .. <br />�''�+..4uL�a. <br />..:-.- ... <br />h � <br />`.'.ns. ...+.+..av++Rn.ww�.,umXt! <br />- <br />..-a-l+itl-r�.kn - .. <br />II. IMPACT FEES <br />The following will outline a possible impact fee which could be <br />assessed to all non -vested water connections on the South Beach if the <br />County serviced the area. The impact fee shown is based on utilizing <br />existing County ordinances. The ordinances utilized are 80-21, Water <br />Main Extensions and 80-22, Reserve Plant Capacity. <br />As the subaqueous crossing of the Indian River is an unusual <br />expense requirement to provide water service, the cost of the subaqueous <br />crossing could be paid for -by the non -vested users of the South Beach <br />System. In addition, it will be necessary to construct a ground storage - <br />tank and booster pumping station to provide full- service for any connec- <br />tion over and above the 1,000 one inch equivalent connections which are <br />now vested in the Sau-th Beach system. This cost will also be considered <br />as required to provide service under the Main Extension Ordinance. Below <br />is a calculation of a possible impact fee-based on the above and consider- <br />ation of a reserve plant capacity fee. <br />A. Main Extension Fees <br />Subaqueous River Crossing Cost $1,6209000 <br />Ground Storage Tank and Pumping <br />Station.Cost = $ -450,000 <br />Total Cost for Main Extensions - $2,070,000 <br />Number of Pion -Vested Connections = .1,248 <br />Associated Impact Fee for -Main _ - <br />Extensions = $. -1,658 <br />B. Reserve Plant Capacity - <br />The -existing fee for providing reserve water treatment plant <br />capacity for future connections to the County's water --system is $250 <br />_0 <br />478 <br />98 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.