My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. WATER BILLS <br />Addendum No. 2 to the South Beach Water System Analysis presented <br />two water bills based on two alternatives for project financing. <br />If private financing at 9% could be arranged, the bill was $49.05. <br />If part of the system utilized FmHA funds and part of the costs were <br />privately funded, the bill was presented at $42.02. <br />The estimated bills shown in Addendum No. 2 represent average <br />bills required to amortize the total Phase I project cost and includes <br />the operation and maintenance cost of $8.55 for actual water production <br />at the water treatment plant ($8.55 0&M costs are for an average water --.-,- <br />consumption of 19,000 gallons per month per connection). However, some <br />bills may actually be greater and some bills may be less, depending on <br />actual consumption. <br />The estimated water bills for the South Beach area are based upon <br />the current County rate structure: Please refer to Attachments I and II <br />as an indicator of estimated water bills based upon an estimated number <br />of connections (living units). <br />� _ _ � - � � � � 'i'h-•`na F .i.. 4L'Ftane...:i:.,*±�+ h'^'• 'i-✓.c3i�S.F`2.7.'�Ki..yzrvs/�AtAI':M^t�if+�n�'K4 <br />44�'a.�t"4 w'. i���^$Si��i.i3F". <br />III. WATER BILLS <br />Addendum No. 2 to the South Beach Water System Analysis presented <br />two water bills based on two alternatives for project financing. <br />If private financing at 9% could be arranged, the bill was $49.05. <br />If part of the system utilized FmHA funds and part of the costs were <br />privately funded, the bill was presented at $42.02. <br />The estimated bills shown in Addendum No. 2 represent average <br />bills required to amortize the total Phase I project cost and includes <br />the operation and maintenance cost of $8.55 for actual water production <br />at the water treatment plant ($8.55 0&M costs are for an average water --.-,- <br />consumption of 19,000 gallons per month per connection). However, some <br />bills may actually be greater and some bills may be less, depending on <br />actual consumption. <br />The estimated water bills for the South Beach area are based upon <br />the current County rate structure: Please refer to Attachments I and II <br />as an indicator of estimated water bills based upon an estimated number <br />of connections (living units). <br />
The URL can be used to link to this page
Your browser does not support the video tag.