Laserfiche WebLink
Our File 0773 <br />December 9, 2008 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />ADDENDUM #1 TO <br />"EXHIBIT 1" <br />Background <br />The Indian River County Utilities Department has decided to amend Work Authorization #11 <br />which was approved by the Board of County Commissioners January 8, 2008. In preparation of <br />the State of Florida Department of Transportation's (FDOT) plans to construct a four -lane to six - <br />lane roadway expansion project along SR -60 between 66th Avenue and 82nd Avenue in Indian <br />River County construction plans were developed to detail utility adjustments required in the <br />proposed construction area. The County's intent was to provide the utility contractor a "one- <br />step" construction process that would allow the required adjustments to be constructed without <br />the need to return and make further adjustments after the completion of the FDOT roadway <br />improvements. <br />As a result, the adjustment planned for the existing 12" sewer force main at the southeast <br />comer of SR -60 and 70 Avenue was designed to re-route the main under the existing 60" and <br />proposed 84" storm pipe in the Indian River Farms Water Control District lateral canal. Although <br />this design meets the intent of the "one-step" construction process, this design will result in a <br />sewer force main being constructed extremely deep and in close proximity to existing and <br />proposed traffic signal mast arms, signal switch gear, drainage pipes, and the Range Line <br />Canal. While this is the best design following the "one-step" policy, it is not desirable since it will <br />be difficult to construct and future maintenance would jeopardize the structural integrity of <br />nearby roadway and drainage improvements. Although this design will require a "two-step" <br />construction process to relocate the force main to its adjusted location, having the force main <br />above rather than below the storm culvert justifies this modification to the construction concept. <br />Scope of Services <br />The additional services covered by this Amendment #1 to Work Authorization #11 will generally <br />consist of the following <br />• Prepare Construction Plans revisions and modifications to IRFWCD Permit to allow the force <br />main to pass over the proposed new FDOT culvert at said location. <br />• Prepare Construction Plans revisions and modification as requested by Indian River County <br />Utilities to amend the design of the water main modifications on the south side of SR60, <br />west of 74th Avenue. <br />(Y:\mm\Projects%2007%0773WDMIMContracts%Addendum#110773 Amend #1 Attach 1_120908.doe) <br />