My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections, tests, and approvals that the results <br />certified indicate compliance with, the Contract <br />Documents. <br />E. The limitations upon authority and responsibil- <br />ity set forth in this paragraph 9.10 shall also apply to <br />ENGINEER's Consultants, Resident Project Repre- <br />sentative, and assistants. <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />10.01 Authorized Changes in the Work <br />A. Without invalidating the Agreement and <br />without notice to any surety, OWNER may, at any time <br />or from time to time, order additions, deletions, or <br />revisions in the Work by a Written Amendment, a <br />Change Order, or a Work Change Directive. Upon <br />receipt of any such document, CONTRACTOR shall <br />promptly proceed with the Work involved which will be <br />performed under the applicable conditions of the <br />Contract Documents (except as otherwise specifically <br />provided). <br />B. If OWNER and CONTRACTOR are unable to <br />agree on entitlement to, or on the amount or extent, if <br />any, of an adjustment in the Contract Price or Contract <br />Times, or both, that should be allowed as a result of a <br />Work Change Directive, a Claim may be made <br />therefor as provided in paragraph 10.05. <br />10.02 Unauthorized Changes in the Work <br />A. CONTRACTOR shall not be entitled to an <br />increase in the Contract Price or an extension of the <br />Contract Times with respect to any work performed <br />that is not required by the Contract Documents as <br />amended, modified, or supplemented as provided in <br />paragraph 3.04, except in the case of an emergency <br />as provided in paragraph 6.16 or in the case of <br />uncovering Work as provided in paragraph 13.04.B. <br />10.03 Execution of Change Orders <br />A. OWNER and CONTRACTOR shall execute <br />appropriate Change Orders recommended by ENGI- <br />NEER (or Written Amendments) covering: <br />1. changes in the Work which are: (i) <br />ordered by OWNER pursuant to paragraph <br />10.01.A, (ii) required because of acceptance of <br />defective Work under paragraph 13.08.A or <br />OWNER's correction of defective Work under <br />paragraph 13.09, or (iii) agreed to by the <br />parties; <br />2. changes in the Contract Price or <br />Contract Times which are agreed to by the <br />parties, including any undisputed sum or <br />amount of time for Work actually performed in <br />accordance with a Work Change Directive; and <br />3. changes in the Contract Price or <br />Contract Times which embody the substance of <br />any written decision rendered by ENGINEER <br />pursuant to paragraph 10.05; provided that, in <br />lieu of executing any such Change Order, an <br />appeal may be taken from any such decision in <br />accordance with the provisions of the Contract <br />Documents and applicable Laws and Regula- <br />tions, but during any such appeal, <br />CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule as provided in <br />paragraph 6.18.A. <br />10.04 Notification to Surety <br />A. If notice of any change affecting the general <br />scope of the Work or the provisions of the Contract <br />Documents (including, but not limited to, Contract <br />Price or Contract Times) is required by the provisions <br />of any Bond to be given to a surety, the giving of any <br />such notice will be CONTRACTOR's responsibility. <br />The amount of each applicable Bond will be adjusted <br />to reflect the effect of any such change. <br />00700 - General Conditions REV 04-07 <br />00700 - 30 <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications100700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.