My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER's observations on the Site of the <br />executed Work as an experienced and qualified <br />design professional and on ENGINEER's <br />review of the Application for Payment and the <br />accompanying data and schedules, that to the <br />best of ENGINEER's knowledge, information <br />and belief: <br />a. the Work has progressed to the point <br />indicated; <br />b. the quality of the Work is generally in <br />accordance with the Contract Documents <br />(subject to an evaluation of the Work as a <br />functioning whole prior to or upon <br />Substantial Completion, to the results of any <br />subsequent tests called for in the Contract <br />Documents, to a final determination of <br />quantities and classifications for Unit Price <br />Work under paragraph 9.08, and to any <br />other qualifications stated in the <br />recommendation); and <br />c. The conditions precedent to <br />CONTRACTOR's being entitled to such <br />payment appear to have been fulfilled in so <br />far as it is ENGINEER's responsibility to <br />observe the Work. <br />3. By recommending any such <br />payment ENGINEER will not thereby be <br />deemed to have represented that: (i) inspec- <br />tions made to check the quality or the quantity <br />of the Work as it has been performed have <br />been exhaustive, extended to every aspect of <br />the Work in progress, or involved detailed <br />inspections of the Work beyond the responsi- <br />bilities specifically assigned to ENGINEER in <br />the Contract Documents; or (ii) that there may <br />not be other matters or issues between the <br />parties that might entitle CONTRACTOR to be <br />paid additionally by OWNER or entitle OWNER <br />to withhold payment to CONTRACTOR. <br />4. Neither ENGINEER's review of <br />CONTRACTOR's Work for the purposes of <br />recommending payments nor ENGINEER's <br />recommendation of any payment, including final <br />payment, will impose responsibility on <br />ENGINEER to supervise, direct, or control the <br />Work or for the means, methods, techniques, <br />sequences, or procedures of construction, or <br />the safety precautions and programs incident <br />thereto, or for CONTRACTOR's failure to <br />comply with Laws and Regulations applicable to <br />CONTRACTOR's performance of the Work. <br />Additionally, said review or recommendation will <br />not impose responsibility on ENGINEER to <br />make any examination to ascertain how or for <br />what purposes CONTRACTOR has used the <br />moneys paid on account of the Contract Price, <br />or to determine that title to any of the Work, <br />materials, or equipment has passed to <br />OWNER free and clear of any Liens. <br />5. ENGINEER may refuse to recom- <br />mend the whole or any part of any payment if, <br />in ENGINEER's opinion, it would be incorrect to <br />make the representations to OWNER referred <br />to in paragraph 14.02.6.2. ENGINEER may <br />also refuse to recommend any such payment <br />or, because of subsequently discovered <br />evidence or the results of subsequent <br />inspections or tests, revise or revoke any such <br />payment recommendation previously made, to <br />such extent as may be necessary in <br />ENGINEER's opinion to protect OWNER from <br />loss because: <br />a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />the occurr <br />the events cnumcr <br />C. Payment Becomes Due <br />1. Ten days after presentation o <br />Application for Payment to 0 ' with <br />ENGINEER's recommen• - "•n, the amount <br />recommended wil - • •sect to the provisions of <br />paragrap - •2.D) become due, and when <br />d - -.11 be paid by OWNER to CONTRACTOR. <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />00700 - General Conditions REV 04-07 <br />00700 - 39 <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp10381 Contract Documents and Specifications\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.