My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. If ENGINEER considers the Work <br />deliver to OWNER a tentative certificate of Substantial <br />Completion which shall fix the date of Substantial <br />Completion. There shall be attached to the certificate <br />a tentative list of items to be completed or corrected <br />before final payment OWNER shall have seven days <br />after receipt of the tentative certificate during which to <br />make written objection to ENGINEER as to any <br />provisions of the -certificate or attached list. If, after <br />considering such objections, ENGINEER concludes <br />that the Work is not substantially complete, <br />ENGINEER will within 11 days after submission of the <br />tentative certificate to OWNER notify CONTRACTOR <br />in writing, stating the reasons therefor. If, after <br />considers the Work substantially complete, <br />as ENGINEER believes justified after consideration of <br />any objections from OWNER. At the time of delivery <br />of the tentative certificate of Substantial Completion <br />TOR a written recommendation as to division of <br />responsibilities pending final payment between <br />OWNER and CONTRACTOR with Fespect to security, <br />operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties <br />and guarantees. Unless OWNER and <br />'' - -- <br />inform ENGINEER in writing prior to ENGINEER': <br />issuing the definitive certificate of Substantial Complc <br />tion, ENGINEER's aforesaid recommendation will be <br />payment. <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify <br />OWNER and ENGINEER in writing that <br />CONTRACTOR considers any such part of the <br />Work ready for its intended use and substan- <br />tially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that <br />part of the Work. Within a reasonable time <br />after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make <br />an inspection of that part of the Work to <br />determine its status of completion. If <br />ENGINEER does not consider that part of the <br />Work to be substantially complete, ENGINEER <br />will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefor. If <br />ENGINEER considers that part of the Work to <br />be substantially complete, the provisions of <br />paragraph 14.04 will apply with respect to <br />certification of Substantial Completion of that <br />part of the Work and the division of <br />responsibility in respect thereof and access <br />thereto. <br />2. No occupancy or separate operation <br />of part of the Work may occur prior to <br />compliance with the requirements of paragraph <br />5.10 regarding property insurance. <br />00700 - General Conditions REV 04-07 <br />00700 - 41 <br />F:\Engineering\Capital Projects \0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\00700 - General Conditions REV 04-07.doc <br />