Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title Article Number <br />Introduction SC - 1.00 <br />Defined Terms SC —1.01 <br />Before Starting Construction SC —2.05 <br />Preconstruction Conference SC — 2.06 <br />Coordination of Plans, Specifications, and Special Provisions SC — 3.06 <br />Subsurface and Physical Conditions SC — 4.02 <br />Performance, Payment and Other Bonds SC — 5.01 <br />Certificates of Insurance SC — 5.03 <br />CONTRACTOR's Liability Insurance SC — 5.04 <br />OWNER's Liability Insurance SC — 5.05 <br />Property Insurance SC — 5.06 <br />Waiver of Rights SC — 5.07 <br />Receipt and Application of Insurance Proceeds SC — 5.08 <br />Labor; Working Hours SC — 6.02 <br />Permits SC — 6.06 <br />Taxes SC — 6.10 <br />Test and Inspections SC — 13.03 <br />Progress Payments SC — 14.02 <br />Mediation SC —16.02 <br />Arbitration SC — 16.03 <br />Liens SC — 17.06 <br />00800-i <br />00800 - SupplementaryConditions <br />00800 IF:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\00800 - Supplementary Conditions.doc <br />