Laserfiche WebLink
paragraph 2.05.B, procedures for handling Shop Drawings and other submittals, <br />and maintaining required records. Utility companies and others as appropriate <br />will be requested to attend to discuss and coordinate work. <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />2. Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />7. Drawings <br />8. Referenced Standards. <br />B. Written/computed dimensions shall govern over scaled dimensions. <br />SC -4.02 Subsurface and Physical Conditions <br />SC -4.02 Add the following new paragraphs immediately after paragraph GC -4.02.8: <br />C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br />Consultants relied upon the following reports of explorations and tests of <br />subsurface conditions at the Site: <br />Soil Survey Report — Oslo Road Boat Ramp Repairs <br />D. Reports and drawings itemized in SC -4.02.0 are not included with the Bidding <br />Documents. Copies may be examined at Indian River County Administration <br />Building, Public Works, 1801 27th Street, Vero Beach, FL 32960 during <br />regular business hours. These reports and drawings are not part of the Contract <br />Documents. <br />SC -5.01 Performance, Payment and Other Bonds <br />SC -5.01.A. Delete paragraph GC -5.01.A in its entirety and insert the following paragraphs in its <br />place: <br />A. Within ten (10) days of receipt of the Contract Documents for execution, the <br />CONTRACTOR shall furnish a Performance Bond in an amount equal to 100% of <br />the Contract Price and a Payment Bond in an amount equal to 100% of the <br />Contract Price. <br />1. The CONTRACTOR shall provide two separate bonds. A combined <br />Payment and Performance Bond for 125% of the Contract Price is not an <br />acceptable substitute. <br />2. In lieu of the Performance and Payment Bonds, the CONTRACTOR may <br />furnish an alternative form of security in the form of cash, money order, <br />certified check, cashier's check, irrevocable letter of credit or a security as <br />listed in Part II of F.S. Chapter 625. Any such alternative form of security <br />shall be for the same purpose, and be for the same amount and subject <br />00800-2 <br />00800 - Supplementary Conditions <br />nfRnn 2F \Fnnineeriso\Capital Proiects\0381 Oslo Road Boat Ramo\0381 Contract Documents and Specifications \00800 - Supplementary Conditions.doc <br />