My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Bid No: 2009024 <br />Project: Oslo Road Boat Ramp Repairs <br />OWNER's Contract No. 2009024 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0381 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />Q Unit Prices <br />O Lump Sum <br />0 Other: <br />O By Change Order: <br />Estimated increase (decrease) in Contract Price: <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in <br />Contract Times <br />0 Contractor's Records <br />0 Engineer's Records <br />1 Other: <br />II By Change Order: <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />RECOMMENDED: <br />By: <br />ENGINEER (Authorized Signature) <br />Date: <br />AUTHORIZED: <br />By: <br />OWNER (Authorized Signature) <br />Date: <br />* * END OF SECTION * * <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\00948 - Work Change <br />Directive.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.