Laserfiche WebLink
B. The CONTRACTOR shall carefully preserve all control stakes, benchmarks, <br />reference points and property corners and will be responsible for any mistake <br />or loss of time caused by their unnecessary loss or disturbance. If the loss or <br />disturbance of the stakes or marks cause a delay in the Work, the <br />CONTRACTOR shall have no claim for damages or extension of time. Control <br />stakes, benchmarks, reference points and property corners disturbed by the <br />CONTRACTOR's work shall be replaced by a Florida Registered Land Sur- <br />veyor and Mapper, at the CONTRACTOR's expense. In the event the Owner <br />must provide the services of the Florida Registered Surveyor and Mapper to <br />perform this replacement work, the cost of the surveying services will be <br />deducted from any sums due to the CONTRACTOR for the work performed <br />under this Contract. <br />C. All survey work shall be performed under the guidance and direction of a <br />Florida Registered Surveyor and Mapper. <br />D. All survey work for Record Drawings shall be performed by a Florida Registered <br />Surveyor and Mapper. <br />+ + END OF SECTION + + <br />1050-2 01050 Field Engineering <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\01050 - Field Engineering.doc <br />