Laserfiche WebLink
necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate <br />traffic control devices, warning devices and barriers, for the protection of the travel <br />in public and workmen, as well as to safeguard the work area in general shall rest <br />with the Contractor. Consideration shall be given to recommendations of the <br />Engineer. The required traffic control devices, warning devices and barriers shall be <br />erected by the Contractor prior to creation of any hazardous condition and in <br />conjunction with any necessary re-routing of traffic. The Contractor shall <br />immediately remove, turn or cover any devices or barriers which do not apply to <br />existing conditions. All traffic control devices shall conform to MUTCD standards <br />and shall be clean and relatively undamaged. Damaged devices diminishing <br />legibility and recognition, during either night or day conditions, are not acceptable <br />for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and <br />the procedures and policies described therein shall in no way act as a waiver of any <br />of the terms of the liability of the Contractor or his surety. <br />F. Non -Compliance: Should the Owner or Engineer determine that traffic within the <br />project is not being maintained in accordance with the approved traffic control plan <br />or presents a public safety concern, the contractor shall have until the end of the <br />working day, in which notification is given, to take action to modify the maintenance <br />of traffic. Should the contractor fail to make such modification the Owner shall have <br />the option to fine the Contractor $400 per day until remedied. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 2 - Maintenance of Traffic - Lump Sum <br />SECTION 00104 - EROSION AND WATER POLLUTION CONTROL <br />PART 1 — GENERAL <br />1.1 SCOPE <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\Technical Specifications - <br />Revised 10-02-08.doc <br />