My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate <br />traffic control devices, warning devices and barriers, for the protection of the travel <br />in public and workmen, as well as to safeguard the work area in general shall rest <br />with the Contractor. Consideration shall be given to recommendations of the <br />Engineer. The required traffic control devices, warning devices and barriers shall be <br />erected by the Contractor prior to creation of any hazardous condition and in <br />conjunction with any necessary re-routing of traffic. The Contractor shall <br />immediately remove, turn or cover any devices or barriers which do not apply to <br />existing conditions. All traffic control devices shall conform to MUTCD standards <br />and shall be clean and relatively undamaged. Damaged devices diminishing <br />legibility and recognition, during either night or day conditions, are not acceptable <br />for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and <br />the procedures and policies described therein shall in no way act as a waiver of any <br />of the terms of the liability of the Contractor or his surety. <br />F. Non -Compliance: Should the Owner or Engineer determine that traffic within the <br />project is not being maintained in accordance with the approved traffic control plan <br />or presents a public safety concern, the contractor shall have until the end of the <br />working day, in which notification is given, to take action to modify the maintenance <br />of traffic. Should the contractor fail to make such modification the Owner shall have <br />the option to fine the Contractor $400 per day until remedied. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 2 - Maintenance of Traffic - Lump Sum <br />SECTION 00104 - EROSION AND WATER POLLUTION CONTROL <br />PART 1 — GENERAL <br />1.1 SCOPE <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\Technical Specifications - <br />Revised 10-02-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.