My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9); <br />2. Performance Bond (pages 00610-1 to 00610-4); <br />3. Payment Bond (pages 00612-1 to 00612-4); <br />4. General Conditions (pages 00700-1 to 00700-45); <br />5. Supplementary Conditions (pages 00800-1 to 00800-10); <br />6. Specifications as listed in the table of contents of the Project Manual; <br />7. Drawings consisting of a cover sheet and sheets numbered 1 through 11, with each <br />sheet bearing the following general title: Oslo Road Boat Ramp Repairs, Project <br />#0381, dated 8/27/08. <br />8. Addenda (numbers 1 to 2' , inclusive); <br />9. Appendices to this Agreement <br />Appendix A — Permits <br />Appendix B — Chapter 4, Best Management Practices <br />Appendix C - Soil Survey Report <br />00520 - 6 <br />C:\Documents and Settings\mmclaughlin\Local Settings\Temporary Internet Files\OLK1A\00520 - Agreement (Public Works).doc <br />00520 - Agreement (Public Works).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.