Laserfiche WebLink
CONTRACTOR'S CERTIFICATION: <br />UNDER PENALTY OF PERJURY, the undersigned CONTRACTOR certifies that (1) all <br />previous progress payments received from OWNER on account of Work done under the <br />Contract referred to above have been applied on account to discharge CONTRACTOR's <br />legitimate obligations incurred in connection with Work covered by prior Applications for <br />Payment numbered 1 through inclusive; (2) title of all Work, materials and equipment <br />incorporated in said Work or otherwise listed in or covered by this Application for Payment will <br />pass to OWNER at time of payment free and clear of all Liens, security interests and <br />encumbrances (except such as are covered by a Bond acceptable to OWNER indemnifying <br />OWNER against any such Lien, security interest or encumbrance); (3) all Work covered by this <br />Application for Payment is in accordance with the Contract Documents and not defective and <br />(4) If this Periodic Estimate is for a Final payment to project or improvement, 1 further certify <br />that all persons doing work upon or furnishing materials or supplies for this project or <br />improvement under this foregoing contract have been paid in full, and that all taxes imposed by <br />No. 212 Florida Statutes, (Sales and Use Tax Act, as Amended) have been paid and <br />discharged, and that I have no claims against the OWNER. <br />Dated <br />By: <br />(CONTRACTOR) <br />State of <br />County of <br />Subscribed and sworn to before me this <br />day of <br />Notary Public <br />My Commission expires: <br />CERTIFICATION OF ARCHITECT OR CONSULTING ENGINEER (WHERE APPLICABLE): <br />I certify that I have checked and verify the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it is a true and correct statement of the <br />work performed and/or material supplied by the Contractor. <br />Dated <br />(ARCHITECT / ENGINEER) SIGNATURE <br />CERTIFICATION OF ENGINEER / INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. It is my opinion that this <br />statement of work performed and/or materials supplied is accurate, that the Contractor is <br />observing the requirements of the Contract, and that the Contractor should be paid the amount <br />requested above. <br />Dated <br />Accompanying Documentation: <br />(ENGINEER/INSPECTOR) SIGNATURE <br />00622 - Contractor's Application for Payment <br />00622 - 2 <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications \00622 - Contractor's Application for Payment.doc Rev. 05/01 <br />