My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.08 Permits 22 <br />6.09 Laws and Regulations 22 <br />6.10 Taxes 22 <br />6.11 Use of Site and Other Areas 22 <br />6.13 Safety and Protection 23 <br />6.14 Safety Representative 23 <br />6.15 Hazard Communication Programs 24 <br />6.16 Emergencies 24 <br />6.17 Shop Drawings and Samples 24 <br />6.18 Continuing the Work 25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 25 <br />ARTICLE 7 - OTHER WORK 26 <br />7.01 Related Work at Site 26 <br />7.02 Coordination 27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 27 <br />8.01 Communications to Contractor 27 <br />8.02 Replacement of ENGINEER 27 <br />8.03 Furnish Data 27 <br />8.04 Pay Promptly When Due 27 <br />8.05 Lands and Easements; Reports and Tests 27 <br />8.06 Insurance 27 <br />8.07 Change Orders 27 <br />8.08 Inspections, Tests, and Approvals 27 <br />8.09 Limitations on OWNER's Responsibilities 27 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8.11 Evidence of Financial Arrangements 28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 28 <br />9.01 OWNER'S Representative 28 <br />9.02 Visits to Site 28 <br />9.03 Project Representative 28 <br />9.04 Clarifications and Interpretations 28 <br />9.05 Authorized Variations in Work 28 <br />9.06 Rejecting Defective Work 29 <br />9.07 Shop Drawings, Change Orders and Payments 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 29 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 30 <br />10.01 Authorized Changes in the Work 30 <br />10.02 Unauthorized Changes in the Work 30 <br />10.03 Execution of Change Orders 30 <br />10.04 Notification to Surety 30 <br />10.05 Claims and Disputes 31 <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 31 <br />11.01 Cost of the Work 31 <br />11.02 Cash Allowances 33 <br />11.03 Unit Price Work 33 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 34 <br />00700 - General Conditions REV 04-07 <br />00700 - 3 <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.