My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER any duty or authority to supervise or direct <br />the performance of the Work or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 9.10 or any other provision <br />of the Contract Documents. <br />B. Day <br />1. The word "day" shall constitute a <br />calendar day of 24 hours measured from <br />midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when modifying <br />the word "Work," refers to Work that is <br />unsatisfactory, faulty, or deficient in that it does <br />not conform to the Contract Documents or does <br />not meet the requirements of any inspection, <br />reference standard, test, or approval referred to <br />in the Contract Documents, or has been <br />damaged prior to ENGINEER's recom- <br />mendation of final payment (unless responsi- <br />bility for the protection thereof has been <br />assumed by OWNER at Substantial <br />Completion in accordance with paragraph <br />14.04 or 14.05). <br />D. Furnish, Install, Perform, Provide <br />1. <br />connection <br />with services, materials, or <br />said services, materials, or equipment to the <br />Site (or some other specified location) ready for <br />condition. <br />2. The word "install," when used in <br />connection with services, materials, or <br />equipment, shall mean to put into use or place <br />in final position said services, materials, or <br />use. <br />3. The words "perform" or "provide," <br />when used in connection with services, <br />materials, or equipment, shall mean to furnish <br />and install said services, materials, or <br />equipment complete and ready for intended <br />uses <br />4. When "furnish," "install," "perform," or <br />"provide" is not used in connection with services, <br />materials, or equipment in a context clearly <br />requiring an obligation of CONTRACTOR, <br />"provide" is implied. <br />E. Unless stated otherwise in the Contract Docu- <br />ments, words or phrases which have a well-known <br />technical or construction industry or trade meaning are <br />used in the Contract Documents in accordance with <br />such recognized meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also <br />deliver to OWNER such Bonds as CONTRACTOR <br />may be required to furnish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish to CONTRACTOR up <br />to ten copies of the Contract Documents. Additional <br />copies will be furnished upon request at the cost of <br />reproduction. <br />2.03 Commencement of Contract Times; Notice <br />to Proceed <br />A. The Contract Times will commence to run on <br />the thirtieth day after the Effective Date of the Agree- <br />ment or, if a Notice to Proceed is given, on the day <br />indicated in the Notice to Proceed. A Notice to Pro- <br />ceed may be given at any time within 30 days after the <br />Effective Date of the Agreement. In no event will the <br />Contract Times commence to run later than the <br />sixtieth day after the day of Bid opening or the thirtieth <br />day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2.04 Starting the Work <br />A. CONTRACTOR shall start to perform the <br />Work on the date when the Contract Times com- <br />mence to run. No Work shall be done at the Site prior <br />to the date on which the Contract Times commence to <br />run. <br />2.05 Before Starting Construction <br />A. CONTRACTOR's Review of Contract Docu- <br />ments: Before undertaking each part of the Work, <br />CONTRACTOR shall carefully study and compare the <br />Contract Documents and check and verify pertinent <br />figures therein and all applicable field measurements. <br />CONTRACTOR shall promptly report in writing to <br />ENGINEER any conflict, error, ambiguity, or <br />discrepancy which CONTRACTOR may discover and <br />shall obtain a written interpretation or clarification from <br />ENGINEER before proceeding with any Work affected <br />00700 - General Conditions REV 04-07 <br />00700 - 8 <br />F:lEngineering\Capital Projects \0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications \00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.