� GIN <br />,#-AIA Document G701TM -2001 <br />Change Order ��s ��� IA UG(V s d C�Lf�LI 3 <br />PROJECT (Name and address): CHANGE ORDER NUMBER: 018 OWNER: <br />Indian River County Jail Expansion DATE: May 08, 2008 ARCHITECT: <br />4055 41st Avenue CONTRACTOR: <br />Vero Beach, FL 32960 <br />TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ <br />Peter R. Brown Construction, Inc. CONTRACT DATE: June 07, 2005 OTHER: ❑ <br />13830 58th Street North, Clearwater, FL CONTRACT FOR: General Construction <br />33760 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable; airy undisputed amount attributable to previously executed Construction Change Directives) <br />Final contract adjustment to close out the contract with the Indian River BOCC for the Indian River County Jail Expansion Project. <br />The attached copy of Pay Appiicatton #25 dated March 30, 2008 identifies final contract savings. Below summarizes the items by <br />category: <br />Builder's Risk Allowarrce',............................................................($ 1,042.10) <br />- Surety Bond..... .. ......................................................................($ 16,194.00) <br />Allowances (Surveyor, Testing, Earthwork, Dewatering, HVAC Testing...... ($$ 75,379.01) <br />03) <br />Precast Concrete ..................................................... ($ 815.80) <br />ProjectContingency.. ,...'.......................................................... . <br />Owner Contin nc ($ 77,059.42) <br />- Escalation.......'' ......... .............................................................($ 99,524.00) <br />Total---- •--- - - ------- -- -- -----------------------------------------------------------($270,014.36) <br />$ 18,301,631.00 <br />The original Guaranteed Maximum Price was $ (547,150.10) <br />The act change by previously authorized Change Orders $ 17,754,480.90 <br />The Guaranteed Maximum Price prior to this Change Order was 270,014.36) <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of ; <br />17,484,466.54 <br />The new Guaranteed Maximum Price including this Change Order will be <br />The Contract Time will be unchanged by Zero ( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Clemons -Rutherford & Associates, Inc. Peter R. Brown Construction, Inc. Indian River County BOCC <br />ARCHITECT (Firm n CONTRACTOR (Firm name) OWNER (Firm name) <br />FL 13830 58th Street North earwate 7� <br />33760 <br />William D. Rutherford( I/ Eduardo <br />(Typed�na�ne) (Typedr <br />� DATE <br />ATE <br />1840 25th Street, SuitcNI18, Vero Beach, <br />AIA Document G701111-2001. Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA'"` 1 <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'v Document, or any <br />re potion it AIA software I at 08:33:58 oin 05/15/ 008 undel and criminal a0 der No.100 03378511 which expires on lties, and will be prosecuted to the maximum <br />/10/2009,and isnot for resale. (2192435619) <br />e law. This document was <br />of n seve User Notes: <br />