My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/3/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/3/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:09:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/03/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` CHANGE ORDERS - #35 AND #37 - ADMINISTRATION BUILDING <br />CONSTRUCTION PROJECT REPRESENTATIVE HERCULES KONTOULAS <br />EXPLAINED THAT CHANGE ORDER #35 (CP -67) CALLS FOR TWO 400 AMP FUSES <br />TO BE INSTALLED IN THE MAIN SWITCH GEAR OF THE ADMINISTRATION BUILDING. <br />HE EXPLAINED THAT WE HAVE TWO CHILLERS WE ARE USING, AND THESE WERE <br />ELECTRIFIED BY REMOTE PANELS AND THEN WERE FED BACK TO THE MAIN DIS- <br />CONNECT. IT APPEARS THE OLD FUSES WERE TAKEN OUT AND THEY OMITTED TO <br />PUT THE NEW ONES IN. MR. KONTOULAS RECOMMENDED THAT THIS CHANGE ORDER <br />BE APPROVED, <br />COSTS. <br />COMMISSIONER FLETCHER STATED THAT HE COULD NOT JUSTIFY THE <br />MR. KONTOULAS NOTED THAT WE ARE TALKING ABOUT LARGE FUSES IN <br />THE MAIN SWITCH GEAR PANEL AND COMMENTED THAT THIS ALSO INCLUDES THE <br />ADDITIONAL WIRING NEEDED. <br />DISCUSSION FOLLOWED RELATING TO THE FACT THAT THE WIRING IS <br />NOT SPECIFICALLY MENTIONED, AND CHAIRMAN LYONS COMMENTED THAT HE DID <br />NOT WANT TO APPROVE A CHANGE ORDER AND THEN GO INTO ARBITRATION BECAUSE <br />THIS DOESNIT CONNECT TO ANYTHING. <br />MR, KONTOULAS ASSURED HIM THAT ALL THIS IS ALLOWED FOR AND <br />UNDERSTOOD, BUT IN THE FUTURE, HE WOULD HAVE IT DETAILED MORE EXPLICITLY. <br />ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />SCURLOCK, THE BOARD UNANIMOUSLY APPROVED CHANGE ORDER NO. 35 - COUNTY <br />ADMINISTRATION BUILDING, IN THE AMOUNT OF $3,384.761 WITH THE NORMAL <br />STIPULATION'THAT BY APPROVING THE CHANGE ORDER, THE COUNTY DOES NOT <br />WAIVE ANY RIGHTS IT HAS TO CLAIM DAMAGES AGAINST THE CONTRACTOR OR <br />THE ARCHITECT BECAUSE OF OMISSIONS OR OTHER REASONS THAT MAY ARISE. <br />i <br />JUN 3198, 81 poor 46 PacF 651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.