Laserfiche WebLink
SC 13.06A Delete the words: "arbitration or" in line 9 of paragraph 13.06.A of the General <br />Conditions. <br />SC13.07A Add the following sentence at the beginning of paragraph 13.07.0 of the General <br />Conditions: <br />The Owner and Contractor agree that a warranty inspection shall be scheduled no later than eleven <br />(11) months after final payment under this Contract so that the Owner and the Contractor may <br />inspect and otherwise examine the Work prior to the expiration of the Performance Bond <br />SC 13.07E Delete paragraph 13.07E of the General Conditions in its entirety and replace with the <br />following: <br />Contractor's obligations under this paragraph 13.07 are in addition to any other obligation or <br />warranty. The provisions of this paragraph 13.07 shall not be construed as a substitute for or a <br />waiver of the provisions of any applicable statute of limitation or any way to limit the Contractor's <br />continued liability for defective Work, including latent defects. <br />SC 13.08A TWO changes: <br />1. Delete the words: arbitration or" in line 8 of paragraph 13.08.A of the General Conditions. <br />2. Delete the phrase "(such costs to be approved by Engineer as to reasonableness)" in lines 10 <br />and 11 of paragraph 13.08.A of the General Conditions. <br />13.09C Delete the words: "arbitration or" in line 4 of paragraph 13.09.0 of the General Conditions. <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br />SC -14.02A.1 <br />Delete the first sentence of paragraph 14.02.A.1 of the General Conditions in its entirety and replace <br />with the following: <br />On or before the tenth (10th) day of each month, the Contractor shall submit completed partial <br />progress payment requests to the Engineer, as set forth herein. Contractor shall submit to Engineer <br />for review an Application for Payment filled out and signed by Contractor covering the Work <br />completed as of the date of the Application for Payment and accompanied by such supporting <br />documentation as is required by the Contract Documents. Such supporting documents shall include <br />but not be limited to, the required Contractors certification; retainage as set forth in the Agreement; <br />and a monthly dated CPM schedule for the Project. The Contractor shall make the following <br />certification (Affidavit) qn each Application for Payment: 1 I hereby certify that the labor and materials <br />listed on this Application for Payment have been used in the construction of this Work and payment <br />received from the last request for payment has been used to make payments to all subcontractors, <br />laborers, material, men and suppliers except as listed below: "Alt payments by Indian River County <br />as Owner shall be made in accordance with the Local Govemment Prompt Payment Act. Florida <br />Statutes section 218.70 et. seq. <br />SC -14.02A.3 <br />Add a new paragraph immediately after paragraph 14.02A.3 of the General Conditions, which is to <br />read as follows: <br />00800-13 <br />H\Projects107411Bidding Contract Specifications1Spec Template12007V00800supplementary Conditions.doc <br />