request for all remaining retainage except as otherwise set forth in this Agreement; and 3) any and <br />all items that require correction under this Agreement and that are identified after the preparation of <br />the Statutory List remain the obligation of the Contractor to complete to the Owner's satisfaction <br />under this Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on the Statutory List <br />and schedule a final walk-through in anticipation of final completion on the Project. <br />SC 14.040 Delete paragraph 14.040 of the General Conditions in its entirety and replace with the <br />following: <br />At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to <br />Owner and Contractor a written recommendation as to division of responsibilities pending final <br />payment between Owner and Contractor with respect to security, operation, safety, and protection of <br />the Work, maintenance, heat, utilities, insurance, and warranties and guarantees. <br />SC14.07A.3 Delete paragraph 14.07A.3 of the General Conditions in its entirety. <br />SC -14.07B.1 Delete paragraph 14.07B.1 of the General Conditions in its entirety and replace with <br />the following: <br />1. If, on the basis of Engineer's observation of the Work during construction and final inspection, <br />and Engineer's review of the final Application for Payment and accompanying documentation, all as <br />required by the Contract Documents, Engineer is satisfied that the Work has been completed and <br />Contractor's other obligations under the Contract Documents have been fulfilled, Engineer will <br />indicate, within twenty days after receipt of the final Application for Payment, in writing Engineer's <br />recommendation of payment and present the Application to Owner for payment. Thereupon <br />Engineer will give written notice to Owner and Contractor that the Work is acceptable. Otherwise, <br />Engineer will return the Application for Payment to Contractor, indicating in writing the reasons for <br />refusing to recommend final payment, in which case Contractor shall make the necessary <br />corrections and resubmit the Application for Payment. <br />SC -14.07.C.1 Delete paragraph GC -14.07.C.1 in its entirety and replace with the following: Payment <br />shall be made by Owner to Contractor according to the Local Government Prompt Payment Act, <br />Florida Statutes section 218. etseq. <br />SC 14.08 Delete paragraph 14.08 of the General Conditions in its entirety. <br />SC 14.09 Delete paragraph 14.09 of the General Conditions in its entirety. <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br />SC -15.02.A.1 Delete subparagraph 15.02.A.1 of the General Conditions in its entirety, and replace <br />with the following: <br />1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents; <br />SC -15.02.A.4 Delete subparagraph 15.02.A.4 of the General Conditions in its entirety, and replace <br />with the following: <br />4. Contractor's violation of any material provisions of the Contract Documents. <br />SC 15.02A5 and 6: Add the following new subparagraphs at the end of paragraph GC -15.02.A <br />00800-15 <br />H\Projects107411Bidding Contract Specifications1Spec Template120071008001supplementary Conditions.doc <br />