Laserfiche WebLink
i <br />WORK CHANGE DIRECTIVE <br />No. <br />PROJECT: DATE OF ISSUANCE: <br />OWNER: <br />(Name, Address) <br />CONTRACTOR: <br />CONTRACT FOR: <br />OWNER's Project No.: <br />ENGINEER: <br />ENGINEER's Project No.: <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any <br />claim for a Change Order based thereon will involve one of the following methods of determining the <br />effect of the change(s). <br />Method of determining change in Contract Price: Method of determining change in Contract <br />Time: <br />[ ] Time and Materials [ ] Contractor's records <br />[] Unit Prices [ ] Engineer's records <br />[ ] Cost plus fixed fee [ ] Other <br />Estimated increase (decrease) in Contract Price Estimated increase (decrease) in Contract Time <br />$ . If the days. If the change involves an <br />change involves an increase, the estimated increase, the estimated time is not to be <br />exceed <br />amount is not to be exceeded without further without further authorization. <br />authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOMMENDED: APPROVED: <br />By: By: <br />Engineer Owner <br />Date: Date: <br />00800-24 <br />HRProjectsW741 (Bidding Contract Specifications1Spec Template12007100800%aupplementary Conditions.doc <br />