My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />WORK CHANGE DIRECTIVE <br />No. <br />PROJECT: DATE OF ISSUANCE: <br />OWNER: <br />(Name, Address) <br />CONTRACTOR: <br />CONTRACT FOR: <br />OWNER's Project No.: <br />ENGINEER: <br />ENGINEER's Project No.: <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any <br />claim for a Change Order based thereon will involve one of the following methods of determining the <br />effect of the change(s). <br />Method of determining change in Contract Price: Method of determining change in Contract <br />Time: <br />[ ] Time and Materials [ ] Contractor's records <br />[] Unit Prices [ ] Engineer's records <br />[ ] Cost plus fixed fee [ ] Other <br />Estimated increase (decrease) in Contract Price Estimated increase (decrease) in Contract Time <br />$ . If the days. If the change involves an <br />change involves an increase, the estimated increase, the estimated time is not to be <br />exceed <br />amount is not to be exceeded without further without further authorization. <br />authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOMMENDED: APPROVED: <br />By: By: <br />Engineer Owner <br />Date: Date: <br />00800-24 <br />HRProjectsW741 (Bidding Contract Specifications1Spec Template12007100800%aupplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.