My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT <br />DATE OF ISSUANCE <br />OWNER Indian River County Board of County Commissioners <br />OWNER's Contract No. M&M Project No. <br />CONTRACTOR ENGINEER Masteller & Moler, Inc. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to <br />the following specified parts thereof: <br />To: <br />And To <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of Remit° be completed or corrected is attached hereto. This list may not be all - <br />i nclusive, and the failure to indude an item in it does not alter the responsibility of CONTRACTOR to <br />complete all the Work in accordance with the contract Documents. The items in the tentative list <br />shall be completed or corrected by CONTRACTOR within Days of the above date of <br />Substantial Completion. <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-30 <br />H1ProjectsW74116idding Contract SpearicationslSpec Template120071008001supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.