Laserfiche WebLink
CONTRACTOR considers necessary for the performance of furnishing of the work at the <br />Contract Price, within the Contract Time and in accordance with the other terms and <br />conditions of the Contract Documents, including specifically the provisions of Paragraph <br />4.02 of the General Conditions; and no additional examinations, investigations, <br />explorations, tests, reports, studies or similar information or data are or will be required by <br />CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of said underground facilities. <br />No additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.04 of the General <br />Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br />discrepancies that he has discovered in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br />ARTICLE 8 CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the work consist of the following: <br />8.1 This Agreement (Section 00530). <br />8.2 Performance and Payment Bonds (Sections 00610 and 00612). <br />8.3 Notice of Award and Notice to Proceed (examples in Section 00800). <br />8.4 General Conditions (Section 00700). <br />8.5 Supplementary Conditions (Section 00800). <br />8.6 Specifications bearing the title "Vero Lake Estates Water Main — Phase 11" as listed in the <br />table of contents hereof. <br />8.7 Drawings, inclusive with each sheet bearing the following general title "Vero Lake Fstatea <br />Water Main — Phase 11" <br />8.8 Addenda numbers 0 to 0 , inclusive. <br />8.9 CONTRACTOR'S Bid (Section 00300). <br />00530-5 <br />H\Projects\0741\Bidding Contract Specifications\Spec Template\2007\00530\Agreement between Owner Contractor Rev. <br />012507.doc <br />