Laserfiche WebLink
TABLE OF CONTENTS <br />Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 6 <br />1.01 Defined Terms 6 <br />1.02 Terminology 8 <br />ARTICLE 2 - PRELIMINARY MA 1"1'ERS 9 <br />2.01 Delivery of Bonds and Evidence of Insurance 9 <br />2.02 Copies of Documents 9 <br />2.03 Commencement of Contract Times; Notice to Proceed 9 <br />2.04 Starting the Work <br />2.05 Before Starting Construction 9 <br />2.06 -. Preconstruction Conference 9 <br />2.07 Initial Acceptance of Schedules 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 10 <br />3.01 Intent 10 <br />3.02 Reference Standards 10 <br />3.03 Reporting and Resolving Discrepancies 10 <br />3.04 Amending and Supplementing Contract Documents 11 <br />3.05 Reuse of Documents 11 <br />3.06 Electronic Data 11 <br />9 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS <br />ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 11 <br />4.01 Availability of Lands 11 <br />4.02 • Subsurface and Physical Conditions 12 <br />4.03 Differing Subsurface or Physical Conditions 12 <br />4.04 Underground Facilities 13 <br />4.05 - Reference Points ...13 <br />4.06 Hazardous Environmental Condition at Site 13 <br />ARTICLE 5 - BONDS AND INSURANCE - 14 <br />5.01 Performance, Payment, and Other Bonds 14 <br />5.02 Licensed Sureties -and Insurers 15 <br />5.03 Certificates of Insurance 15 <br />5.04 Contractor's Liability Insurance 15 <br />5.05 Owner's Liability Insurance - 16 <br />5.06 Property Insurance 16 <br />5.07 Waiver of Rights 17 <br />5.08 Receipt and Application of Insurance Proceeds 17 <br />5.09 Acceptance of Bonds and Insurance; Option to Replace 17 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 18 <br />ARTICLE 6 - CONTRACTORâ–º' S RESPONSIBILITIES 18 <br />6.01 Supervision and Superintendence 18 <br />6.02 Labor; Working Hours 18 <br />6.03 Services, Materials, and Equipment 18 <br />6.04 Progress Schedule 18 <br />6.05 Substitutes and "Or -Equals" 19 <br />6.06 . Concerning Subcontractors, Suppliers, and Others 20 <br />6.07 Patent Fees and Royalties 21 <br />6.08 Permits 21 <br />6.09 Laws and Regulations 21 <br />6.10 Taxes 22 <br />6.11 Use of Site and Other Areas 22 <br />_. 6.12 Record Documents 22 <br />6.13 Safety and Protection 22 <br />6.14 Safety Representative 23 <br />6.15 Hazard Communication Programs 23 <br />EJCDC C-700 Standard General Condition of the Construction Contract. <br />Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 3 <br />