My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.16 Emergencies <br />6.17 Shop Drawings and Samples •23 <br />6.18 Continuing the Work .23 <br />6.19 Contractor's General Warranty and Guarantee 24 <br />6.20 Indemnification 24 <br />6.21 Delegation of Professional Design Services .24 <br />ARTICLE 7 - OTHER WORK AT THE Sim .25 <br />7.01 .Related Work at Site 25 <br />7.02 Coordination •25 <br />7.03 Legal Relationships .26 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 26 <br />8.01 Communications to Contractor 26 <br />8.02 Replacement of Engineer .26 <br />8.03 Furnish Data •26 <br />8.04 Pay When Due 26 <br />8.05 Lands and Easements; Reports and Tests 26 <br />8.06 Insurance .26 <br />8.07 Change Orders 26 <br />8.08 Inspections, Tests, and Approvals 26 <br />8.09 Limitations on Owner's Responsibilities 26 <br />8.10 Undisclosed Hazardous Environmental Condition .27 <br />8.11 Evidence of Financial Arrangements .27 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION .27 <br />9.01 Owner's Representative .27 <br />9.02 Visits to Site 27 <br />9.03 Project Representative 27 <br />9.04 Authorized Variations in Work •27 <br />9.05 Rejecting Defective Work 27 <br />9.06 Shop Drawings, Change Orders and Payments •27 <br />9.07 Determinations for Unit Price Work • 28 <br />9.08 Decisions on Requirements of Contract Documents and Acceptability of Work - 28 <br />9.09 Limitations on Engineer's Authority and Responsibilities 28 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 28 <br />10.01 Authorized Changes in the Work 28 <br />10.02 Unauthorized Changes in the Work 28 <br />10.03 Execution of Change Orders 29 <br />10.04 Notification to Surety 29 <br />10.05 Claims 29 <br />ARTICLE 11- COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK 30 <br />11.01 Cost of the Work 30 <br />11.02 Allowances 30 <br />11.03 Unit Price Work 31 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 31 <br />32 <br />12.01 Change of Contract Price <br />12.02 Change of Contract Times 32 <br />12.03 Delays 33 <br />33 <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 33 <br />13.01 Notice of Defects 33 <br />13.02 Access to Work 33 <br />13.03 Tests and Inspections 33 <br />13.04 Uncovering Work 34 <br />13.05 Owner May Stop the Work 34 <br />13.06 Correction or Removal of Defective Work 34 <br />13.07 Correction Period 34 <br />13.08 Acceptance of Defective Work <br />35 <br />13.09 Owner May Correct Defective Work <br />35 <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 36 <br />14.01 Schedule of Values 36 <br />- 14.02 Progress Payments 36 <br />14.03 Contractor's Warranty of Title 37 <br />14.04 Substantial Completion 37 <br />EJCDC C-700 Standard General Condidons of the Construction Contract. <br />Copyright ® 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.