My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br />PART I - AMENDMENTS TO GENERAL CONDITIONS <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (EJCDC Document No. C-700, 2002 edition) and other provisions of the <br />Contract Documents as indicated below. All provisions which are not so amended or supplemented <br />remain in full force and effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />SC -1.01A.43. <br />Delete paragraph 1.01A.43. of the General Conditions in its entirety and replace with the following: <br />43. Specifications - Sections induded under Division 1 through Division 2 of the Project Manual. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />SC -2.01B. <br />Delete paragraph 2.01B of the General Conditions in its entirety and replace with the following: <br />B. Before any Work at the site is started, Contractor shall deliver to Owner, with copies to Engineer, <br />certificates of insurance, which Contractor is required to purchase and maintain in accordance with <br />the requirements of the Contract Documents. <br />SC 2.03A <br />Delete paragraph 2.03A of the General Conditions in its entirety, and replace with the following: <br />The Contract Times will commence to run on the day indicated in the Notice to Proceed. A <br />Notice to Proceed may be given at any time within 60 days after the Effective Date of the <br />Agreement. <br />SC 2.05A1 Add the following immediately at the end of subparagraph 2.05A1: using the Critical <br />Path Method (CPM). <br />SC 2.05A.4 Add new subparagraph 4 after the existing text of 2.05 of the General Conditions: <br />4. If this Project is an addition to an existing working plant, then the Contractor shall coordinate <br />with the Owner on tie-ins. The Owner shall have final say on plant shut down times and duration to <br />make tie-ins. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC -3.01 C <br />Add a new paragraph immediately after Paragraph 3.010 of the General Conditions which is to read <br />as follows: <br />00800-3 <br />H\Projects107411Bidding Contract Spec fications'Spec Template120071008001supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.