My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Contractor warrants and guarantees to owner for one Gear from the date of Frnat Completion <br />th.st all Work will be in accordance with the Contract Documents and will not be defective, provided, <br />however, that manufacturer equipment warranties may be of a longer duration <br />SC-6,20A <br />Delete paragraph 6.20A of the General Conditions in its entirety <br />SC-6.21 E <br />Delete paragraph 6.21 E of the Goneral Conditions in its entirety and replace with the tolluwing <br />E Contractor shall not be responsible for the adequacy of the performance criteria or design criteria <br />required by or contained in the Contract Documents. <br />ARTICLE 7 OTHER WORK AT THE SiTE <br />No Changes <br />ARTICLE 8 OWNER'S RESPONSIBILITIES <br />SC -8.02 Delete paragraph 8.02 of the General Conditions in its entirety and replace with the following: <br />If owner terminates the employment of Engineer, Owner may appoint another engineer whose status <br />under the Contract Documents shall be that of the former Engineer. <br />SC -8.04 Delete paragraph 8.04 of the General Conditions in its entirety and replace with the following; <br />Payments under this contract are governed by the Local Government Prompt Payment Act, Florida <br />Statutes section 218.70 et. seq., <br />SC -8.06 <br />Delete paragraph 8.06 of the General Conditions in its entirety. <br />SC -8.11 <br />Delete paragraph 8.11 of the General Conditions in its entirety. <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />SC 9.02 Delete the first sentence of paragraph 9.03A of the General Conditions in its entirety and <br />replace with the following. <br />A. Engmeer will make visits to the Site at intervals appropriate to the various stages of construction as <br />Engineer deems necessary in order to observe as an experienced and qualified Engineer the progress <br />that has been made and the gijality-of the various aspects of Contractor's executed Work. <br />SC -9.03A <br />Add the following new paragraph immediately after paragraph 9 03A of the General Conditions Witch <br />is to read as follows, <br />8 Engineer wail ftirnish a part -t me Pfo ect Representative Contractor is respcnsrt)le to ai,;e 24-tio,tr <br />notice on all required inspections so tb3t the Project Representative may be present <br />0,06100-9 <br />t, _ ,ay •,•+'kd.� %�:'( <br />
The URL can be used to link to this page
Your browser does not support the video tag.