My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement. After receipt of the Statutory List by the Contractor, the Contractor acknowledges and <br />agrees that it will diligently proceed to complete all items on the Statutory List and schedule a final <br />walk-through in anticipation of final completion on the Project <br />SC 14.04D Delete paragraph 14.04D of the General Conditions in its entirety and replace with the <br />following: <br />At the time of delivery of the tentative certificate of Substantial Completion, Engineerwill deliver to Owner <br />and Contractor a written recommendation as to division of responsibilities pending final payment between <br />Owner and Contractor with respect to security, operation, safety, and protection of the Work. <br />maintenance, HVAC, utilities, insurance, and warranties and guarantees. <br />SC14 07A.3 Delete paragraph 14.07A.3 of the General Conditions in its entirety. <br />SC -14.0713.1 Delete paragraph 14.078.1 of the General Conditions in its entirety and replace with the <br />following: <br />1 If, on the basis of Engineer's observation of the Work during construction and final inspection, and <br />Engineer's review of the final Application for Payment and accompanying documentation, all as <br />required by the Contract Documents, Engineer is satisfied that the Work has been completed and <br />Contractor's other obligations under the Contract Documents have been fulfilled, Engineer will indicate, <br />within twenty days after receipt of the final Application for Payment, in writing Engineer's <br />recommendation of payment and present the Application to Owner for payment. Thereupon Engineer <br />will give written notice to Owner and Contractor that the Work is acceptable. Otherwise, Engineer will <br />return the Application for Payment to Contractor, indicating in writing the reasons for refusing to <br />recommend final payment, in which case Contractor shall make the necessary corrections and <br />resubmit the Application for Payment. <br />SC -14.07.C.1 Delete paragraph GC -14.07.0.1 in its entirety and replace with the following: Payment <br />shall be made by Owner to Contractor according to the Local Government Prompt Payment Act, <br />Florida Statutes section 218. et.seq. <br />SC 14.08 Delete paragraph 14.08 of the General Conditions in its entirety <br />SC 14.09 Delete paragraph 14.09 of the General Conditions in its entirety <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br />SCA 5.02.A.1 Delete subparagraph 15.02.A.1 of the General Conditions in its entirety, and replace <br />with the following: <br />1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents; <br />SC -15.02.A.4 Delete subparagraph 15.02.A.4 of the General Conditions in its entirety, and replace <br />with the following: <br />4. Contractor's violation of any material provisions of the Contract Documents <br />SC 15.02.A 5 and 6: Add the following new subparagraphs at the end of paragraph GC -15.02.A <br />5 Failure of Contractor to make proper payments to Subcontractors for labor, services, materials or <br />equipment in connection with the Work; <br />6. If Contractor abandons the Work, or assigns Contract or any part thereof, without the previous <br />written consent of Owner, otherwise than in accordance with the Contract Documents <br />00800 14 <br />C ,T;wisiQt,i o ooboo SupF ,.nzrt } C�r.�,tao^s Ouc <br />
The URL can be used to link to this page
Your browser does not support the video tag.