SC 17.02 through and including 17 09 <br />Add the following new paragraphs after paragraph 17.01 of the General Conditions <br />17.02 Utilities: The Contractor shall, at its expense, arrange for, develop and maintain all utilities in <br />Work areas to meet the requirements of the Contract. Such utilities shall be furnished by Contractor at <br />no additional cost to the Owner, and shall include but not be limited to the following public telephone <br />service for the Contractor's use; construction power as required at each point of construction: and <br />water as required throughout the construction. Prior to final acceptance of the Work the Contractor <br />shall, at its expense, satisfactorily remove and dispose of all temporary utilities developed to meet the <br />requirements of the Contract. <br />17.03 Drainage. The contractor shall so conduct its operations and maintain the Work in such <br />condition that adequate drainage will be in effect at all times. Existing functioning storro sewers, <br />gutters, ditches and other run-off shall not be obstructed. <br />17.04 Fire Hydrants: Fire hydrants on or adjacent to the i ,ghway shall be kept accessible to fire <br />apparatus at all times and no material or obstruction shall be placed within fifteen feet (15) of any such <br />hydrant. <br />17.05 Protection of Structures: Heavy equipment shall not be operated close enough to pipe headwalls <br />or other structure to cause their displacement. <br />17.OG Fencing: On all Work which includes fencing and where the Engineer determines it to be <br />necessary for maintaining the security of livestock or adjacent property, or for protection of pedestrians <br />who are likely to gain access to the Work from adjacent property, the Contractor shall erect an <br />appropriate temporary security fence as a first order of business. Temporary fencing shall be installed <br />at temporary construction easement areas on all commercial and residential properties appropriate to <br />secure the Work area and protect persons and domestic animals. At all times the Contractor shall <br />conduct the Work under secure temporary fencing. Permanent fencing shall be addressed as required <br />by the Plans and Specifications. <br />17.07 Record Drawings: The Contractor shall keep one record copy of all Specifications, Drawings, <br />Addenda, Modifications, and Shop Drawings at the site in good order and annotated to show all <br />changes made during the construction process. These items shall be available to the Engineer and <br />shall be delivered to the Engineer for the Owner. Record Drawings shall be submitted with each pay <br />request. Final acceptance of the Work will be withheld until the approval of such documents is made <br />by the Owner. <br />17.9A Progress Videotapes: Contractor shall deliver to the Owner both prior to commencing the <br />Project and before receipt of Final Payment a DVD -type color video of the Project showing the site <br />before and after Work has been completed. Contractor shall audibly identify on the video the station <br />numbers as those areas of the Project are recorded. T he cost of the video shall be included in the bid <br />submitted by the Contractor, <br />17.09 Commercial Activities Contractor shall not establish any commercial activity or issue <br />concessions or permits of any kind to third parties for establishing commercial activities on land owned <br />or controlled by Owner. Contractor shall not allow its employees to engage in any commercial activities <br />on the Project site. <br />G0800-16 <br />D'DIVISION 0,00,800 SuppiemMt.!ary Cond,!.ons doc <br />