Laserfiche WebLink
14. Completion: <br />a Before ENGINEER issues a Certificate of Substantial Completion, submit to <br />CONTRACTOR a list of observed items requiring completion or correction. <br />b Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or corrected <br />C. Verify that all items on final list have been completed or corrected and make <br />recommendations to ENGINEER concerning acceptance <br />C LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Project Representative <br />�. Shall not authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3. Shall riot undertake any of the responsibilities of CONTRACTOR, Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods. <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />S. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests <br />*END OF SECTION' <br />00&40- 341 <br />i3',�IV �'CrJ 0'60800 S: ppyf-,(!ntaq C0-01't�01)s �40e <br />