My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Completion: <br />a Before ENGINEER issues a Certificate of Substantial Completion, submit to <br />CONTRACTOR a list of observed items requiring completion or correction. <br />b Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or corrected <br />C. Verify that all items on final list have been completed or corrected and make <br />recommendations to ENGINEER concerning acceptance <br />C LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Project Representative <br />�. Shall not authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3. Shall riot undertake any of the responsibilities of CONTRACTOR, Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods. <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />S. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests <br />*END OF SECTION' <br />00&40- 341 <br />i3',�IV �'CrJ 0'60800 S: ppyf-,(!ntaq C0-01't�01)s �40e <br />
The URL can be used to link to this page
Your browser does not support the video tag.