My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
writing, through the Engineer, of any non-compliance with State or Local <br />requirements. After receipt of such notice from the E=ngineer or from the regulatory <br />agency through the Engineer, immediately take corrective action. Such notice, when <br />delivered to the Contractor or his authorized representative at the site of the work, <br />shall be deemed sufficient for the purpose. If the Contractor flails or refuses to <br />comply promptly, the Owner may issue an order stopping all or part of the work until <br />satisfactory corrective action has been taken. No part of the time lost due to any <br />such stop orders shall be made the subject of a claim for extension of time or for <br />excess costs or damages by the Contractor unless it Is later determined that the <br />Contractor was in compliance. <br />1.04 IMPLEMENTATION <br />A. Prior to commencement of the work, meet with the Engineer to develop mutual <br />understandings relative to compliance with these provisions and administration of the <br />environmental pollution control program. <br />B. Remove temporary environmental control features, when approved by the Engineer <br />and incorporate permanent control features into the project at the earliest practicable <br />time. <br />PART 2 - PRODUCTS fnot ysed! <br />FART 3 - EXECUTION <br />3.01 EROSIONS CONTROL <br />A. Provide positive means of erosion control such as shallow ditches around <br />construction to carry off surface water. Erosion control measures, such as siltation <br />basins, hay check dams, mulching, jute netting and other equivalent techniques, <br />shall be used as appropriate. Offsite surface water shall be diverted around the site, <br />to a downstream channel ahead of siltation barriers. Flow of surface water into <br />excavated areas shall be prevented. Ditches around construction area shall also be <br />used to carry away water resulting from dewatering of excavated areas. At the <br />completion of the work, ditches shall be backfilled and the ground surface restored to <br />original condition. <br />3.02 PROTECTION OF STREAMS AND SURFACE WATERS <br />A. Take all precautions to prevent, or reduce to a minimum, any damage to any stream <br />or surface water from pollution by debris, sediment or other material, or from the <br />manipulation of equipment and/or materials in or near such streams. Water that has <br />been used for washing or processing, that contains oils or sediments that will reduce <br />the quality of the water in the stream, shall not be directly returned to the stream. <br />Divert such waters through a settling basin or filter before being directed into streams <br />or surface waters. <br />01110-2 <br />D:\DIVISION 1\01110 Environmental Protection Procedures.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.