My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Resubmittals will be handled in the same manner as first submittals. On resubmittals the <br />Contractor shall identify all revisions made to the submittals, either in writing on the letter <br />of transmittal or on the shop drawings by use of revision triangles or other similar <br />methods. The resubmittal shall clearly respond to each comment made by the Engineer <br />on the previous submission. Additionally, the Contractor shall direct specific attention to <br />any revisions made other than the corrections requested by the Engineer on previous <br />submissions. <br />F. Partial submittals may not be reviewed. The Engineer will be the only judge as to the <br />completeness of a submittal. Submittals not complete will be returned to the Contractor <br />and will be considered "Not Approved" until resubmitted. The Engineer may at his option <br />provide a list or mark the submittal directing the Contractor to the areas that are <br />incomplete. <br />G. Repetitive Review <br />1. Shop Drawings and other submittals will be reviewed no more than twice at the <br />Owner's expense. All subsequent reviews will be performed at times convenient to <br />the Engineer and at the Contractor's expense based on the Engineer's then <br />prevailing rates. The Contractor shall reimburse the Owner for all such fees invoiced <br />to the Owner by the Engineer. Submittals are required until approved, <br />2. Any need for more than one resubmission, or any other delay in obtaining Engineer's <br />review of submittal will not entitle Contractor to extension of the contract time. <br />H. If the Contractor considers any correction indicated on the shop drawings to constitute a <br />change to the Contract Documents, the Contractor shall give written notice thereof to the <br />Engineer at least 7 working days prior to release for manufacture. <br />When the shop drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />further changes therein except upon written instructions from the Engineer. <br />1.06 DISTRIBUTION <br />A. Distribute reproductions of approved shop drawings and copies of approved product data <br />and samples, where required, to the job site file and elsewhere as directed by the <br />Engineer. Number of copies shall be as directed by the Engineer but shall not exceed six. <br />1.07 GENERAL_ PROCEDURES FOR SUBMITTALS <br />A. Coordination of Submittal Times: Prepare and transmit each submittal sufficiently in <br />advance of performing the related work or other applicable activities, or within the time <br />specified in the individual work of other related Sections, so that the installation will not be <br />delayed by processing times including disapproval and resubmittal (if required), <br />coordination with other submittals, testing, purchasing, fabrication, delivery and similar <br />sequenced activities. No extension of time will be authorized because of the Contractor's <br />failure to transmit submittals sufficiently in advance of the Work. <br />01300-5 <br />D \DIVISION 1\01300 Submitlals doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.