My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01410 <br />TESTING LABORATORY SERVICES <br />PART 1 — GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Contractor will employ and pay for the services of an independent testing laboratory to <br />perform certain specified testing. All testing described in the contract Documents shall <br />be paid for by the Contractor. This requirement takes precedence over any other <br />specification that may indicate that the testing fees (including collection, shipping and <br />laboratory fees) be paid for by the Owner or any other party other than the Contractor. <br />Payment for all testing will be included in the cost o"tie mains. <br />1. Contractor shall cooperate with the laboratory to facilitate the execution of its <br />required services, <br />2. Employment of the laboratory shall in no way relieve Contractor's obligations to <br />perform the work of the Contract. <br />B. Selection of testing laboratory shall be approved by Engineer and Owner. <br />1.02 RELATED REQUIREMENTS <br />A. General Conditions of the contract: Inspections and testing required by laws, <br />ordinances, rules, regulations, orders or approvals of public authorities. <br />B. Respective sections of specifications: Certification of Products. <br />C. Each specification section listed: Laboratory tests required and standards for testing. <br />D. Testing Laboratory inspection, sampling and testing is required for but not limited to <br />the following: <br />1. Trenchless Installation of Pressure Mains is included in Section 02320 <br />2. Testing and Inspection of Reuse Mains is included in Section 02660 <br />1.03 QUALIFICATION OF LABORATORY <br />A. Meet "Recommended Requirements for Independent Laboratory Qualification," <br />published by American Council of Independent Laboratories. <br />B. Meet basic requirements of ASTM E329, "Standards of Recommended Practice for <br />Inspection and Testing Agencies for Concrete and Steel as Used in Construction." <br />C. Authorized to operate in the State in which the Project is located. <br />D. Submit copy of report of inspection of facilities made by Materials Reference <br />Laboratory of National Bureau of Standards during the most recent tour of Inspection, <br />with memorandum of remedies of any deficiencies reported by the inspection. <br />E. Testing Equipment: <br />1. Calibrated at reasonable intervals by devices of accuracy traceable to either: <br />01410-1 <br />D 1GIVISION 1NO1410lesting Laboratory Services.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.