Laserfiche WebLink
SECTION 01600 <br />DELIVERY, STORAGE AND HANDLING <br />FART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. This Section specifies the general requirements for the delivery handling,slordulo <br />and protection for all items required in the construction of the work. Specllic <br />requirements, if any, are specified with the related item. <br />1.0Z TRANSPORTATION AND DELIVERY <br />A- Tran$p4rt and handle items in accordance with manufacturer's instructions. <br />B. Schedule delivery to reduce long term on-site storage prior to installation and/or <br />operation. Under no circumstances shall equipment be delivered to the site mord <br />than one month prior to installation without written authorization from the Engineer. <br />C. Coordinate delivery with installation to ensure minimum holding time for items that <br />are hazardous, flammable, easily damaged or sensitive to deterioration. <br />D. Deliver products to the site in manufacturer's original sealed containers or other <br />packing systems, complete with instructions for handling, storing, unpacking, <br />protecting and installing. <br />E. All items delivered to the site shall be unloaded and placed in a manner which will <br />not hamper the Contractor's normal construction operation or those of <br />Subcontractors and other Contractors and will not interfere with the flow of <br />necessary traffic. <br />F. Provide necessary equipment and personnel to unload all items delivered to the site. <br />G. Promptly inspect shipment to assure that products comply with requirements, <br />quantities are correct and items are undamaged. For items furnished by others (i.e. <br />Owner, other Contractors), perform inspection in the presence of the Engineer. <br />Notify Engineer verbally, and in writing, of any problems. <br />1.03 STORAGE AND PROTECTION <br />A. Store and protect products in accordance with the manufacturer's instructions, with <br />seals and labels intact and legible. Storage instruction shall be studied by the <br />Contractor and reviewed with the Engineer by him/her. Instruction shall be carefully <br />followed and a written record of this kept by the Contractor. Arrange storage to <br />permit access for inspection. <br />B. Store loose gfanulilr materials on 3oli0 fl,3t surfAceS ir} a w-all-dMin-ad afpa_ Prevwtt <br />mixing with foreign matter. <br />*END OF SECTION* <br />01600-1 <br />D'\DIVISION 1\01000 Delivery Storage and Handling.doc <br />