My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
analysis of aL proposed substitutions noted on his substitutions list. No substitution shall <br />be considered unless the Contractor provides the required data in accordance with the <br />requirements of this Section within the 30 day period. <br />B. Submit separate request for each substitution. Support each request with: <br />1. Complete data substantiating compliance of proposed substitution with requirements <br />stated in Contract Documents <br />a. Product identification, including manufacturer's name and address. <br />b. manufacturer's literature; identify: <br />1) Product description. <br />2) Reference standards. <br />31 Performance and test data. <br />4) Operation and m aintenarice data. <br />c. Samples, as applicable. <br />d. Narne and address of similar projects on which product has been used, and <br />date of each Installation. <br />2. Itemize,(] comparison of tho proposed substitution with product specified; List <br />significant variations. Substitution, shall not change design intent and shall perform <br />equal to that specified. <br />3. Data relating to impact on construction schedule occasioned by the proposed <br />substitution, <br />4. Any effect of substitution on separate contracts. <br />5. List of changes required in other work or products. <br />G. Accurate cost data comparing proposed substitution with product specified. <br />a. Amount of any not change to Contract Sum. <br />7. Designation of required license fees or royalties. <br />8. Designation of availability of maintenance services, sources of replacement <br />materials. <br />C. Substitutions will not be considered for acceptance when: <br />1. They aro indicated or implied on shop drawings or product data submittals without a <br />formal requost from Contractor, <br />2. They arc) requested directly by Fa Subcontractor or supplier. <br />3. Acceptance will Wquirc sub%l anlial revision of Contract Documents. <br />D. Requests for substitutions submitted ;after Notice of Award will not be considered unless <br />evidonco is submitted to the E noirwer that Lill of the following circumstances exist: <br />1. Tho spociflod product is, unavailablo for roasons beyond the control of the <br />Contractor Such rea scmla -,hall consi it of strikes, bankruptcy, discontinuance of <br />rtranufOCIU I', oI 'ICIS of God <br />2. 1 ha Contractor pl,ac od, oc dtlormplud to placo, orders for the specified products <br />within fO diays +jilts Nolic o of Awwd. <br />3. Request for Fi ib�;titulion is m ado in writing to the Engineer within 10 days of the date <br />on which tho Coratrac,lot that Ito cannot obtain the item specified. <br />4. Comploto duta itti :>ut foith humin to pormit complete analysis of the proposed <br />"mbstitutioll Is ";Wpiasltod with tho raactuost. <br />E. The Enginour's ducisson log ardillo uvaluation of substitutions shall be considered final <br />and binding. ROtILIUStfi (Of tunea Miunsaons Sand ►additional costs based on submission of, <br />accoplanco of, or roluc.tion of sub slitutions will not bo allowed. All approved substitutions <br />will be incorpor-lt(fd uato tho Adreonwill by (Juilloo Older <br />0 '163 2 <br />D 1DIVISION 101630' sub: hiu•.iow, ancf hon ! I <br />
The URL can be used to link to this page
Your browser does not support the video tag.