My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01700 <br />CONTRACT CLOSEOUT <br />PART 1 — GENERAL <br />1.01 SCOPE OF WORK <br />A. This Section specifies administrative and procedural requirements for project <br />closeout, including but not limited to: <br />1. Closeout procedures. <br />2. Final cleaning. <br />3. Adjusting. <br />4. Project Record documents. <br />5. Spare parts and maintenance materials. <br />1.02 RELATED WORK <br />A. Warranties and Bonds are included in Section 01740. <br />1.03 RECORD DOCUMENTS <br />A. Maintain on site, one set of the following documents; actual revisions to the work <br />shall be recorded in these documents: <br />1. Contract Drawings. <br />2. Specifications. <br />3. Addenda. <br />4. Change Orders and other Modifications to the Contract. <br />5. Reviewed shop drawings, product data, and samples. <br />B. Store Record Documents separate from documents used for construction. <br />C. Record information concurrent with construction progress. <br />D. Specifications: Legibly mark and record at each product section description of actual <br />products installed, including the following: <br />1. Manufacturer's name and product model and number. <br />2. Product substitutions or alternates utilized. <br />3. Changes made by Addenda and Modifications. <br />E. Contract Drawings and Shop Drawings: Legibly mark each item to record actual <br />construction including: <br />1. Measured depths of foundations in relation to finish floor elevation datum. <br />2. Measured horizontal and vertical locations of underground utilities and <br />appurtenances, referenced to permanent surface improvements. <br />3. Measured locations of internal utilities and appurtenances concealed in <br />construction, referenced to visible and accessible features of the work. <br />4. Field changes of dimension and detail. <br />5. Details not on original Contract Drawings. <br />01700-1 <br />DADIVISION 1\01700 Contract Closeout.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.