Laserfiche WebLink
Liquid clay type colloidal drilling fluid shall consist of at least 10 percent of high-grade carefully <br />processed bentonite to consolidate cuttings of the soil, to seal the walls of the hole, and to <br />furnish lubrication for subsequent removal of cuttings. The slurry, which is heavier than the <br />surrounding material, is high in colloids of the bentonite type and it will deposit a thin filter cake <br />of low permeability material on the walls of the bore. This will allow only a small amount of the <br />fluid to pass into the surrounding soil and will also stabilize the bore. The colloidal content of <br />the fluid imparts excellent lubricating qualities to the slurry, which is a distinct aid to the removal <br />of the soil cuttings. <br />Pneumatic or water -jetting methods will be considered unacceptable due to the possibility of <br />surface subsidence. <br />After an initial bore has been completed, a rearner will be installed at the termination pit and the <br />HDPE pipe shall be pulled back to the starting pit. The reamer shall be capable of discharging <br />liquid clay to facilitate the installation of the pipe into a stabilized and lubricated tunnel. <br />A minimum of one (1) insulated 45 trace wires shall be. installed along with the HDPE. The <br />trace wire shall be tested for continuity upon completed installation. <br />Upon completion of boring and pipe installation, the Contractor shall remove all spoils from the <br />starting and termination pits. All pits shall be restored to their original condition. <br />Restoration of Paved, Improved and Unimproved Areas <br />The shoulders, ditches, banks and slopes of roads and railroads crossed and paralleled shall be <br />restored to their former condition and properly sodded so that they shall not wash out before <br />becoming consolidated. Restoration shall be as required by the jurisdictional authority and as <br />specified within the Contract Document. Road and railroad crossings and parallel installations <br />are to be continuously maintained until the completion of the work. No direct compensation <br />shall be paid for Contractor's repair or maintenance of crossings and parallel installations. <br />• END OF SECTION ' <br />02320-3 <br />DADIVISION 2!02320 Insiallation by Directional Boring.rloc <br />