My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling: Immediately after completion of the seeding, the entire grassed or mulched area shall be <br />rolled thoroughly with the equipment specified. At least two trips over the entire area will be <br />required. <br />Watering: Newly seeded areas are not to be watered to force the seed germination, but only to <br />sustain grass growth. Water will only be used on vegetated areas when permitted by the <br />Engineer, <br />Operations on Steep Slopes: On steep slopes when mulching is called for, the mulch material <br />may be anchored down in lieu of being cut into the soil by use of a machine. Anchoring may be <br />done by either of the following methods: <br />1. Placing a layer of soil, approximately two inches thick by nine inches wide, along the upper <br />limits of the mulch, and spotting soil piles over the rest of the area at a maximum spacing of <br />four feet. <br />2. Spreading a string net over the mulch, using stakes driven flush with the top of the mulch, at <br />six-foot centers, and stringing parallel and perpendicular, with diagonals in both directions. <br />MAINTENANCE <br />The Contractor shall, at his expense, maintain the planted areas in a satisfactory condition until <br />final acceptance of the project. Such maintenance shall include the filling, leveling, and repairing <br />of any washed or eroded areas, as may be necessary. The Engineer, at any time, may require <br />replanting of any areas in which the establishment of the grass stand does not appear to be <br />developing satisfactorily. If a planted area must be replanted due to the Contractor's negligence, <br />carelessness, or failure to provide routine maintenance of such areas, such replacement shall be <br />at the Contractor's expense. If replanting is necessary due to factors determined to be beyond the <br />control of the Contractor, payment for replacement will be made under the appropriate contract <br />pay items. <br />` END OF SECTION <br />02485-4 <br />DmpvlSION 2\02485 Orassing.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.