My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pipe color shall be as follows: <br />1. Water main shall be blue in color or have blue continuous stripes the entire length of pipe. <br />2. Wastewater force main shall be green in color or have green continuous stripes the entire <br />length of pipe. <br />3. Reuse main shall be purple in color or have purple continuous stripes the entire length of <br />pipe. <br />Number 10 single conductor copper trace wire shall be spiral wrapped or affixed to the top of all <br />pipe and fittings. See Trace Wire Detail PVI -14 for specifications regarding installation. <br />Installation <br />Polyethylene (PE) Pipe shall be installed in accordance with the instruction of the manufacturer, <br />as shown on the Drawings and as specified herein. A factory qualified joining technician as <br />designated by the pipe manufacturer shall do all heat fusion joints. <br />Care shall be taken in loading, 'transporting and unloading to prevent injury to the pipe. Pipe or <br />fitting shall not be dropped. All pipe or fittings shall be examined before installation, and no <br />piece shall be installed which is found to be defective. Any darnage to the pipe shall be repaired <br />as directed by the Engineer. If any defective pipe is discovered after it has been installed, it <br />shall be removed and replaced with a sound pipe in a satisfactory manner by the Contractor, at <br />his own expense. <br />Under no circumstances shall the pipe or accessories be dropped into the trench. <br />Care shall be taken during transportation of the pipe such that it will not be cut, kinked or <br />otherwise damaged. <br />Ropes, fabric or rubber protected slings and straps shall be used when handling pipes. Chains, <br />cables or hooks inserted into the pipe ends shall not be used. Two slings spread apart shall be <br />used for lifting each length of pipe. <br />Pipes shall be stored on level ground, preferably turf or sand, free of sharp objects that could <br />damage the pipe. Stacking of the polyethylene pipe shall be limited to a height that will not <br />cause excessive deformation of the bottom layers of pipes under anticipated temperature <br />conditions. Where necessary due to ground conditions, the pipe shall be stored on wooden <br />sleepers, spaced suitably and of such width as not to allow deformation of the pipe at the point <br />of contact with the sleeper or between supports. <br />Care shall be exercised when lowering pipe into the trench to prevent damage or twisting of the <br />pipe. <br />Pipe shall be laid to lines and grade shown on the Drawings with bedding arid backfill as shown <br />on the Drawings. <br />When laying is not in progress, including lunchtime, the open ends of the pipe shall be closed by <br />fabricated plugs, or by other approved means. <br />02627-4 <br />WDIVISION 2\02827 Force Mains . Polyethylene Pipe doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.