Laserfiche WebLink
SECTION 00530 - EJC OC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT ("Agreement" or "Contract"), dated theday in the year <br />2009 by and between Indian River County, a political subdivision of the State of Florida (hereinafter <br />called OWNER) and Tri -Sure Corporation (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />'els follows: <br />ARTICLE 1 WORK <br />1.1 CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />completo all of the necessary labor, material, and e ,L)ipment to perforin the work as <br />specified or indicated in the Contract Documents. The work is generally described as follows <br />which shall include, but is not limited to: <br />A. 16" REUSE WATER MAIN EXTENSION ALONG LATERAL G CANAL <br />Indian River County (IRC) proposes to construct a 16" reuse main and abandon an <br />existing 8" sewer force main within the Indian River Farms Water Control'District <br />Lateral "G" Canal right-of-way from 57"' Street (Storm Grove Road) to 77`' Street <br />(Hobart Road), a distance of approximately 15,200 LF. The proposed 16" reuse <br />main will be constructed along the alignment of the existing 8" sewer force main for <br />approximately 8,525 LF of the project. It is the intent of IRC that the 16" reuse main <br />be constructed in the trench of the removed 8" sewer force main, and that the <br />removal/construction take place simultaneously for this portion, of the project. <br />The remaining 6,675 LF of the project will be constructed at a different route from <br />the existing 8" force main. it is the intent of Indian River County that the existing 8" <br />force main will be capped and abandoned in place per IRCUD and FDEP <br />requirements. <br />B. 16" REUSE WATER MAiN - 57i' STREET 1Y0 53" STREET <br />Indian River County proposes to construct a 16" reuse main starting at 53rd Street <br />heading north within a 30' utility easement located in the; Waterway Village site, <br />crossing the North Relief Canal and then paralleling the west property line of the <br />Indian River County RIB site, then crossing the Indian River Farms Water Control <br />District Canal G-1, and ending at 57`h Street (Storm Grove Road), The project <br />includes approximately 1,910 LF of proposed 16" reuse main to connecting to the <br />existing lines on 53't' Street and 57"' Street. <br />C. The projects consist of, but is not limited to: utilities exploration, coordination <br />with permitting agencies, trenching, dewatering, removal and grouting of <br />existing pipe, installation of pipe with fittings and all appurtenances; valves, <br />wet taps, pips joint restrainers, air release valves, and directional bores; soil <br />compaction, testing, restoration of both paved and non -paved areas, and <br />traffic control. <br />00530-1 <br />