Laserfiche WebLink
a. Contractor knew of the existence of such <br />conditions at the time Contractor roads a final <br />Conlillitltlent to Owner with tespecl to Contlaci <br />Price and Contract Tii11CS by tile StrbillkSlln1 OFA <br />Bid or becoming bound under a negotiated <br />contract, or <br />b. the existence of such condition could <br />reasonably have been discovered or mrvated as a <br />result of ally es:mlrllaflvtl. investigation. explo- <br />tation. test, or study of the Site and contiguous <br />areas required by the Bidding Requirements or <br />Contract Documents to be conducted by or fkw <br />Contractor prior to Contractor's making such <br />final conintitment: or <br />c. Contractor failed to t!,!%e the \Sriuen notice aj <br />required by Paragraph 4.03.A. <br />+. If Owner and Contractor are unable to agree on <br />entitlement to or on the .mount or extent, if any. of <br />l)ry adjustment in the Contract Price or Contract <br />holes, or berth, a Claim may be made therefor as <br />provided in Paragraph 10.05. Owner and <br />L-tigineer•, and any of' their Relined Entities shall not <br />be liable fO Contractor for any claims, costs, losses. <br />Or damages (including but not limited to all tees and <br />charges of engineers, architects, attorneys• and other <br />professionals and all court or arbitration or other <br />dispute resolution costs) sustained by Contractor un <br />or in connection with any other prk jest or anticipated <br />project. <br />4,04 Cockle-giuxnrihOcililies <br />A Shutt n cit hulwatc'd The inf6rmaliwi and data shown <br />or indicates( in the Contract Documents %vitll respect to <br />existing underground Facilities at or contiguous to the <br />Site is based un inforination and data furnished to O%%ner <br />err Engineer by file owners of such Underground Facili- <br />ties, including Owner, or by others. Unless it is otherwise <br />expressly provided in the Supplementary Conditions: <br />1 Owner and Frigirim shall not be responsible for <br />the accuracy or completeness of any such inforination <br />or data: and <br />'. the cost of all of the following will be included <br />ill the Contract Price, and Contractor shall have full <br />m,puti iNli;y toe <br />a. re%irwini! and checking aA such intt+rmataon <br />and data, <br />b. locating all Undetground Facthtics shown or <br />indicafed in !fie Contract Docuructns. <br />c', coordination of flIC `h ark %% nth the Owner, of <br />uch t_ n(Myround f acihtirs, imluding O%\nCr, <br />doting construo:ritni, and <br />cf. the valet\ and protection of all such under- <br />ground Facilines and repairing any dtunagc <br />thereto resulting from the Work. <br />13. Yw SAmnr nr Indo nr"rl <br />I. If an (:nderground Facility is unto, eml or <br />tevealed at or contiguous to the Site which w;as not <br />shown or indicated, (it not shown or indicated \vrth <br />reasoitalalc aC�iiraCy in the Contract Documents, <br />Contractor shall, prompth ailer becoming more <br />thereof and bettrre tlrrfiwt disturbing conditions <br />attested therebv or performing any `,York in <br />connection therewith (except in an cmerolency as <br />required by Paragraph 5.16.A), idemit'\• the q\%Iter of <br />such I ndergruund 1 ,tciiity and g;%e writtui notice to <br />that ny„ ter and it, Gaoler anis F.nginecr_ Engineer \+iii <br />ptornittly rc\ie%% file ! Indergr:iund 1'acihty and <br />detennilu: the extent, if any. to \%Inch a change is <br />required in the Contract Documents to reflect and <br />document the consequences of th;: existence ur <br />location of the C nderground Facilih During, such <br />time. Contractor :;hail be responsible for the ,aleth <br />and protection of such Underground Facility. <br />2. If Engineer concludes that a change in the <br />Contract Documents is required, a Work Change <br />Directive or a Change Order \will be issued to reflect <br />and document such consequences. An equitable <br />adjustment shall be made in the Contract Price or <br />Contract Times, or both, to the extent that they are <br />attributable to the existence or location of ane <br />Underground facility that was not shown or indicated <br />cr not shown or indicated with reasonable accurac% <br />in the Contract Documents and that Contractor did <br />not know of and could not reasonat\l\ have been <br />expected to be aware of or to ha\e ;anticipated If <br />O%%ner and Contractor are unable to agree on <br />entitlement to or on the amount ar extent. if any, of <br />any such adjusmient in Contract Price or Culartact <br />)lines, Owner or Contractor may make a t_'fainr <br />therefor as provided tit Paragraph 10.0`` <br />4,05 R,,A•rcm v Pointe <br />A. Owner shall provide engineering, surveys to Csiahlish <br />refercnce pomis for construction which in Engineer `% <br />judgment are neer..>san to enable Contractor to prokeed <br />%%iib the \%ork. Contractor shall be respo,wbfe l""r la%inti <br />out the Work, shall protect and preset%e the cst:ibfished <br />reference points anct pruperty nlunuurenl;, and ,ha:l make <br />Ilk) %panus or rehications without the ptio: %%I IItell <br />approval of0wiler. Contractor shall report to Eulginret <br />whenever ary referene,_ pouts or prnperty rnumnnent i, <br />lust ur destrt):Vd or rryuitt-s lelucatiotr hec;etlW of <br />necCt.sar} changes in �,rades kir locations, and sh.011 t>e <br />rviponsible flit the accurate mpla.k nment rt ,'I <br />>uch rctercnce pones kir properi% rm}nutticnt's by <br />frroics<tt,rr-.tliy ytrahficd prn.�nnca <br />1_0 Its 1 - iMmATA41d taetrfal4'onirsa'! <br />a: Ulsgri t�lG :rh'2.'i.�hkaa •rte,e€p;¢\ofV OOA,,lw,ak foigkrsrr. rare 114 Oil %1116;tl11,'C"F 0 <br />tsU�IK; • 13 <br />