Laserfiche WebLink
6.0.1 Prowt,.\.\ Scheilttle <br />A. Coiltrtctor shall adhete al the. Progress Schedule <br />established in accordance with Paragraph 2.07 as it nlay <br />be adjusted front time to tittle as provided bktjo%v. <br />i. Contractor shall submit to lingineer tix <br />acceptance Ito the extent indicated in Paragraph 2 07) <br />proposed ad,itistmems in the. Progress Schedule that <br />will not result in changing the Contract Times. Such <br />ad)nitilient3 will conlpi) \kith any provisions of the <br />General Requirements applicable thereto. <br />2. Proposed ild.iushllents in the Progress Schedule <br />.?lilt %kill cllarlge 111;: Contract I'mics shall be <br />submitted in accrordance \\-fill the requlrcilleili5 tit' <br />Articie 12 Adjustments in Contract I'inies may only <br />be made by a Change Order. <br />6.05 .17rR.c1111ifev will it -h-qu ills <br />A. 11'henever an item of material or equipment is <br />specified or described in the Contract Documents by <br />using the name of a proprietary item or the name of a <br />particular Supplier, the specification or description is <br />intended to establish the type, function, appearance, and <br />quality required. Unless the specification or description <br />contains or is followed by words reading that no like. <br />equivalent, or "or -equal" item or no substitution is <br />permitted, other items of material or equipment or <br />material or equipment of other Suppliers may be <br />Submitted to Engineer for review (alder the circumstances <br />described below. <br />I. ' Or -Equal" Items ll, fit Engineer's sole discretion <br />an item of material or equipment proposed b\ <br />Contractor is functionally equal to that nailed and <br />sufficiently similar so that no change in related Work <br />will be required. it nmy be considered by Engineer as <br />all "or -equal" item, in \which case revtc\c and <br />approval of the proposed item may, in Engineer's <br />soic discretion, hs accomplished \kithout complianu <br />\kith some or all of the requirements fix approval of <br />proposed substitute items. 1 -or the purposes of this <br />Paragraph 6.05.A. I. a proposed iteral of inatcrial or <br />equipment will be considered functionally equal to an <br />item so nailed if. <br />a. in the exercise -)f reasonable judgment <br />1_rtgincer dvierinum, that. <br />l } it is at least equal in materials of <br />constiuction, quality, durahilil%, appe;rrance, <br />Similgtll, and dcSIP'll cla;tractcri:tics; <br />1 it vsill rchibl\ petimm st least cquall� <br />well file funaion and achieve the result, <br />imposed tE the dcsipn t:vm:v at of (he <br />+o7opfcit°ill l'rv)CLI us:e fdnklionvg- .(bole. <br />t± it has a proven lccold of tier Iiatt£ance <br />anti avadabihiN 01, respoltsivr >tn ire: and <br />1+. Conliactot t ilitics that, it approved and <br />1110uporated into the 'i\ ork: <br />1) there will be 110 nuclease to cost it, the <br />M\ or inereaw. in Contract 'I imes. and <br />2) it «ill confilt•.n substantialik to the <br />detailed requirements of the item named m <br />the Conlract Ear Liulnml�,_ <br />Substitute lfettls <br />a 11' in Engineer's sole dricreuon an item r:1, <br />malcri<d , cquipmenl proposed by Contractor <br />does not qualify is an "or equal' item under <br />Paragraph 605-A 1. it \011 he considered a <br />proposed substilu(e ileal <br />h. ('0111 :£clot ~hall submit sufficient inturnatinrl <br />as provided belLm to allow Engineer to <br />determine that file item of mai rial or equipment <br />proposed is essentially etittivalent to (hilt named <br />and all acceptable substitute lherelor. Requests <br />for reww of proposed substitute items of <br />material or equipment will not he accepted by <br />Engineer from anyone other than Contractor. <br />c file requirements for review b} Fngineer \\ill <br />lie as wt ioilh in Paragr2l?)r 6 05.:1?.t1, :rs <br />supplemented in cite General Requirements and <br />as Engineer may decide is appropriate under the <br />Circumstances. <br />d Contractor shall make written application to <br />Lngineer for ret iv\k of a proposed substitute item <br />of :11aterial or equipment that Contractor sects to <br />furnish or use. The application <br />I t shall certite that t!,e prop—ed sub>tittile <br />:tell) will: <br />ai perforin adcquatciv the 1,11111,11011. <br />and achiekc the re"uhs called for by the <br />Leneral design, <br />bi be lilmlar rn Subst, 1,o stat <br />specified, and <br />0 he suited to the ",tine use as that <br />speckled: <br />21 \% ill stati: <br />,tr the extent, it it iv to vsliikit fir fisc o) <br />tw proposdu subswllle itern will preiu <br />dile Ctiutraiitr'> ichtc%v hent tit <br />�ilrlrstailliA r ti,illpte�l, ri it lint', <br />1 14 1st t --+ar >tra: l rq! 1'fAct'rl t_vDil.-waa%of rice l +: fill tucl e1,, I t,nlatAr <br />,if l"e IrIIAa SAI iatiNetil fvW #J4 IK- <br />6A) <br />K aAc w I -o <br />