Laserfiche WebLink
B. Contractor shall aflottl each other contractor Otho is a <br />party to suds a ditect contract, cacti utility otFner anti <br />C)wner, if owner k pertornning other work with Owner's <br />en)ployces, proper and safe access to the Site. a reason- <br />able upportantity for the introduction and storage ill- <br />materials <br />fmaterials and equipment and the execution of such other <br />work, and shall properly coordinate the Work with theirs. <br />Contractor shall do all cutting, lifting, and patching of the <br />Work that may he tequired to properly connect or <br />otherwise make as w\cral parts come together and <br />properly integrate with such other work Contractor shall <br />not endanger any worl. ol'others by cutting, excavating, <br />or otherwise altering their work and will only cut or alter <br />their work with the written con<{ It of Engineer and the <br />ethers whose work will Iv affected. The duties and <br />respnnsibilities of Contractor under this Paragraph are for <br />the benefit of such utility Owners and other contractors to <br />the extent that there are comparable provisions for the <br />benefit of Contractor in said direct contracts between <br />Owncr and such utility owners and other contractors. <br />C. I f the proper execution or results of lily part of <br />C'ontractor's Wong depends upon work performed by <br />others under this Article 7, Contractor shall inspect such <br />other work and promptly report to Engineer in writing any <br />delay s, defects, or deficiencies in such other work that <br />render it unavailable or unsuitable for the proper <br />execution and reslllts of C'ontractor's Work. Contractor's <br />failure to so report \N ill constitute an acceptance ol'such <br />other work as tit and proper for integration with <br />Contractor's Work except for latent defects and <br />deficiencies in such other work. <br />7.02 C'vortlinat:an <br />A. If(-)wtier intends to contract with others for the <br />perfomance of other work on file Project at the Site, the <br />lollnving will be set forth in Supplementary Conditions: <br />i the individual or entity who will have authority <br />and responsibility to coordination of the activities <br />among tine various contractors will be identified; <br />2. the sivcific matters to be covered by such <br />,itahority and responsibility will he itemized; and <br />3. the extern of such authority ;aid responsibilities <br />will he Prov ided <br />I: lviess other%tae provided lit the Supplementary <br />Candilions, Ownrr shall have sole aulhurit-, and respon- <br />sibility for such coordination <br />7 o? Legal lrt ;atumshtt s <br />disrtiphon costs Incurred Itt t ontractor as a wsuit of itiv <br />other contractor's actions or inactions. <br />C. Contractor shall be liable to Owner and any other <br />contractor for the reasonable direct delay inddisruption <br />costs incurred bN such other citnuactor as a resell of <br />C'ontractor's action or inactions. <br />AR I It"LL- 3 - O1vNEWS RI-SPONSIM1 I TILS <br />8.01 t untntrutii {stuns iu Cold., actnt <br />A. Except as otherwise provided in these General Condi- <br />tions, Wner shall issue all communication 1+_+Conn.n.tor <br />through Flfl�.neer <br />3.02 Replacement al Fngirery <br />A. In case ol'ternlinatiorl of the employ anent of I:rtgincer. <br />Owner shall appoint an engineer to whom Contractor <br />makes no reasonable objection, whose sran,s under the <br />Contract Documents shall be that of elle litnncr L lginec, <br />8.03 burnish Data <br />A. Owner shall promptly furnish the data required of <br />Owner under the Contract Doctnnents <br />8.0.1 Pur It hell D11" <br />A. Owner shall make payments to Cunnacior when they <br />are due as provided in Paragraphs 14.02.(' and 14.07 C. <br />3.05 Lamis anri /.rtcevatunls, ke'r+r;rIV arta Ie%t.V <br />A. Owner's duties in respect of providir:g lams and <br />easements and providing engineering surscys to establish <br />reference points arc set forth in Pautgraphs 4.01 and 4 05. <br />Paragraph 4.02 refers to Owner's identifying and makine <br />available to Contractor copies of reports of exploration .s <br />and tests of subsurfao e conditions and drawings of <br />physical conditions in or (cutin( to existine surface or <br />subsurface structure: at or conti2110u� to the Site aha; haw e <br />been utilized by engineer in Preparing lite Contract <br />Document;. <br />SAo 11MOMI, <br />A- C)wni r rr.punsibihtnc,. if am, in rr'pe,1 tai pill <br />civasing and maintanarne lability and property ms amwe <br />are set forth iu Article <br />S.07 C'hangt- t)r,lro,; <br />..1 t'aregraphs 7 Ui.A ane+ 7.tJ? atrr ori appliablc ibr <br />utilities not ender IhC control of O%net A. Own*:7 is obligaied i,, rsecute 4'hanLe (halal, 1s <br />Indiciated Int {';Ira.gtapli 1011, <br />It I jJ1 otticr direct .'OntlAct of ( )wlcr'tttttlet 11,11 tap!! <br />'01 :'bait pio%Ov ih.al the othrr c:+ta'racti+r a4 li;+k'c 1.1 <br />( h%nt'i anis r i.titia.l.v tau the ivA\onabl. d:tect d.las and <br />l M"i3t�( `rMs 4t�ixalnrd f.rrcrr ixl4 anntlte.,a6, yr lh[l.,ae.laomeit,nf untrait <br />r� urD16l t+1 ± x(7$12 •�NSIi 044 "-lFi+[{! u) rrr'i_i}r�tS9'ze;fl t. n)IF4iT1`[♦ (ail F..1{ tl:{ Ott ri+'nf. rt':, ri CO <br />